-
Notifications
You must be signed in to change notification settings - Fork 6k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
planner: move PhysicalIndexLookupReader related logic into physical op dir
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62935
opened Aug 11, 2025 by
King-Dylan
Loading…
2 of 13 tasks
planner: use riskResult for sum in compareCandidates (WIP)
contribution
This PR is from a community contributor.
do-not-merge/needs-linked-issue
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62931
opened Aug 11, 2025 by
ichen032
Loading…
1 of 13 tasks
planner: be compatible with new tipb format
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#62928
opened Aug 11, 2025 by
winoros
Loading…
2 of 13 tasks
*: replace GetTableStats with GetPhysicalTableStats (#62790)
do-not-merge/cherry-pick-not-approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#62925
opened Aug 11, 2025 by
ti-chi-bot
Loading…
1 of 13 tasks
dxf service: cp cross keyspace info schema loading related PRs
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62922
opened Aug 11, 2025 by
D3Hunter
Loading…
2 of 13 tasks
global sort: limit the memory usage of merge sort MergeKVIter
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
dxf/crossks: check by inner fields not global var and make crossks real tikvtest work
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62918
opened Aug 11, 2025 by
D3Hunter
Loading…
1 of 13 tasks
br: drop a fixme in br since its 8.0+ now
contribution
This PR is from a community contributor.
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#62914
opened Aug 10, 2025 by
yihong0618
Loading…
13 tasks
expression: fix the issue where folding constants breaks the original expression.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#62913
opened Aug 9, 2025 by
hawkingrei
Loading…
1 of 13 tasks
planner: move PhysicalIndexMergeReader related logic into physical op dir
approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62911
opened Aug 9, 2025 by
King-Dylan
Loading…
2 of 13 tasks
globalsort: use partitioned prefix to store intermediate files
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62905
opened Aug 8, 2025 by
D3Hunter
Loading…
2 of 13 tasks
[DNM]Debug ut
do-not-merge/invalid-title
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
tests: fix unit tests for next-gen
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#62895
opened Aug 8, 2025 by
tangenta
Loading…
1 of 13 tasks
variable: change tidb_redact_log to global variable
approved
compatibility-breaker
Violation of forwards/backwards compatibility in a design-time piece.
lgtm
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62892
opened Aug 8, 2025 by
xhebox
Loading…
3 of 13 tasks
planner: move PhysicalExchangeSender+PhysicalExchangeReceiver related…
contribution
This PR is from a community contributor.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62888
opened Aug 8, 2025 by
yihong0618
Loading…
1 of 13 tasks
stats: avoid creating pseudo stats table when dumping stats delta
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#62887
opened Aug 7, 2025 by
Tristan1900
•
Draft
1 of 13 tasks
planner: Index pruning 3rd attempt (WIP)
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#62886
opened Aug 7, 2025 by
terry1purcell
Loading…
1 of 13 tasks
statistics: handle the adding index event correctly
needs-cherry-pick-release-8.5
Should cherry pick this PR to release-8.5 branch.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62884
opened Aug 7, 2025 by
0xPoe
Loading…
1 of 13 tasks
txn: Fix the problem that with pessimistic-auto-commit enabled, some internal transactions may try to commit transaction with MaxUint64
do-not-merge/needs-triage-completed
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62881
opened Aug 7, 2025 by
MyonKeminta
Loading…
1 of 13 tasks
ddl: add system table Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
INFORMATION_SCHEMA.SCHEMATA_EXTENSIONS
to check read only status
do-not-merge/work-in-progress
addindex: add checkpoint operator for dxf
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62876
opened Aug 7, 2025 by
GMHDBJD
Loading…
1 of 13 tasks
planner: refactor join-recorder
contribution
This PR is from a community contributor.
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#62873
opened Aug 7, 2025 by
undertaker86001
Loading…
2 of 13 tasks
[DNM] store/copr: support async coprocessor
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#62869
opened Aug 7, 2025 by
zyguan
Loading…
13 tasks
expr: add pbConvert for tici expression
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#62868
opened Aug 7, 2025 by
wshwsh12
Loading…
13 tasks
ddl: prohibit the execution of some ddl when database is in read only status
component/dumpling
This is related to Dumpling of TiDB.
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
Previous Next
ProTip!
Exclude everything labeled
bug
with -label:bug.