-
Notifications
You must be signed in to change notification settings - Fork 4.7k
Pull requests: openshift/origin
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
TRT-2197: use fixed seed for test ordering
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29997
opened Jul 17, 2025 by
neisw
Loading…
OCPEDGE-1983: [TNF] Fix test suite filtering to include Disrupted tagged tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29996
opened Jul 17, 2025 by
clobrano
Loading…
WIP TLS registry update for July 2025
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
vendor-update
Touching vendor dir or related files
#29995
opened Jul 17, 2025 by
vrutkovs
Loading…
NO-JIRA: oc idle: Increase timeout of endpointslice status check
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29994
opened Jul 17, 2025 by
ardaguclu
Loading…
[release-4.19] NO-JIRA: auditloganalyzer: update test name, remove duplicated test
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
qe-approved
Signifies that QE has signed off on this PR
#29992
opened Jul 16, 2025 by
openshift-cherrypick-robot
Loading…
WIP: OCPNODE-3004: Add ImageVolume e2e tests
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29987
opened Jul 15, 2025 by
bitoku
Loading…
OCPEDGE-1755 Add TNF E2E tests for ungraceful node shutdown
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
OCPBUGS-59176: skip specific tests if DNSManaged is false
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29985
opened Jul 14, 2025 by
lihongan
Loading…
CCO-690: Register cloud-credential-operator tests extension
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29984
opened Jul 14, 2025 by
huangmingxia
Loading…
OCPBUGS-59203: OCPBUGS-57524: Improve MCN test stability
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29981
opened Jul 10, 2025 by
isabella-janssen
Loading…
NO-JIRA: Allow only including / excluding specific extension images
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29980
opened Jul 10, 2025 by
stbenjam
Loading…
OCPBUGS-59159: Adjust DNS success rate to 98.0% for SNO upgrade test.
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29978
opened Jul 9, 2025 by
jaypoulz
Loading…
OTA-1580: Upgrade-time test for Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
oc adm upgrade status
do-not-merge/work-in-progress
#29977
opened Jul 9, 2025 by
petr-muller
•
Draft
MON-4288: register CMO tests extension
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29974
opened Jul 8, 2025 by
machine424
Loading…
OCPFeatureGate:SigstoreImageVerification update test on v1 (Cluster)ImagePolicy
vendor-update
Touching vendor dir or related files
#29973
opened Jul 8, 2025 by
QiWang19
Loading…
OCPBUGS-58354: disruptioninclusterapiserver: bump timeout to 10 mins
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29970
opened Jul 8, 2025 by
vrutkovs
Loading…
OCPBUGS-58461:Backport pr 29834 to release-4.18
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29968
opened Jul 8, 2025 by
wangke19
Loading…
MULTIARCH-5390: Reapply "Merge pull request #29808 from Prashanth684/4552-cvo-test"
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29967
opened Jul 8, 2025 by
Prashanth684
Loading…
NO-JIRA: Bump Go to 1.24
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29965
opened Jul 7, 2025 by
mdbooth
Loading…
Revert "Revert "trt-2163: return error""
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29964
opened Jul 7, 2025 by
neisw
Loading…
(not for review) OCPBUGS-57524
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#29961
opened Jul 7, 2025 by
isabella-janssen
•
Draft
OCPBUGS-57032: upgrade.go: wait some time after node upgrade
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29960
opened Jul 7, 2025 by
dgrisonnet
Loading…
CNF-18625: Adjust Communication matrix tests to use commatrix plugin
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
vendor-update
Touching vendor dir or related files
#29958
opened Jul 7, 2025 by
shirmoran
Loading…
OTA-1580: Add basic test for Indicates that this PR references a valid Jira ticket of any type.
oc adm upgrade status
CLI
jira/valid-reference
#29954
opened Jul 4, 2025 by
petr-muller
Loading…
Get enabled featuregates from metrics endpoint
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#29952
opened Jul 2, 2025 by
dfajmon
Loading…
Previous Next
ProTip!
Follow long discussions with comments:>50.