# EP06 — Operations, trips and logbook Task IDs, titles, phase, cut, type, effort, priority and dependencies follow the existing [generated index](docs-enterprise-backlog-INDEX.md). Task descriptions were reconstructed from trip requirements, [state model](docs-enterprise-state-model.md), [offline sync](docs-enterprise-offline-sync.md) and [validation](docs-enterprise-testing.md). Local F1 requires M0 closure and protected integration of the current ADR-019 construction batch. See the sequencing decision. Recovered scope follows the surviving requirements and acceptance scenarios. Detailed trip rules are in [the recovered trip design](docs-enterprise-modules-trips.md). ### EMP-TRIP-006 — Panel: trips list, timeline detail and review - **Meta:** module TRIP · phase F2 · cut C1 · priority P0 · type WEB · size M · state TODO - **Objective:** Show authorized trip detail, timeline and review in the company panel. - **Rules and use cases:** REQ-07.3, BR-AUTH-013, BR-REV-007, EDR-028 - **Depends on:** EMP-TRIP-004, EMP-PLAT-008 - **Read first:** trip requirements, [state model](docs-enterprise-state-model.md), [offline sync](docs-enterprise-offline-sync.md) and [validation](docs-enterprise-testing.md) - **Scope:** in: scoped list, timeline and permitted decisions · out: computed work hours and client authority - **Areas:** existing: organization scope, fleet, sync and review conventions · proposed: owning trip domain, adapters and consumers - **Steps:** Pin the stated acceptance and denial cases before changing the owning entry point. Verify the affected consumers. - **Deliverable:** The panel exposes only scoped facts and distinct operational, sync and review states. - **Acceptance:** The panel exposes only scoped facts and distinct operational, sync and review states. - **Negative cases:** Foreign result, missing reason, stale decision or report shown as a time record. - **Validation:** V-WEB, V-AUTHZ, V-ISO · migration: rehearse additive upgrade and recovery if persistent state changes · rollback: close the new entry and preserve accepted evidence - **Risks and assumptions:** The [trip design](docs-enterprise-modules-trips.md) supplies the transition and policy boundaries. C1 remains driver-initiated and the logbook remains operational. - **Done when:** The stated result and denials pass the listed validation profiles.