# App consolidation continuation prompt State: planning handoff only, 2026-10-14. Read [master](docs-planning-APP_CONSOLIDATION_PLAN.md) and [target rules](docs-product-APP_CONSOLIDATION_TARGET_CONTRACT.md). A/B/C: PLANNED. D: DEFERRED_FUTURE / NOT_AUTHORIZED. ## Copyable prompt for explicitly selected A–C implementation > Execute only the authorized A/B/C range, one bounded task at a time; start > OPT-A00 if no accepted task evidence exists. Read AGENTS, FAST_EXECUTION, > current PROGRESS, selected ROADMAP/stage and relevant source/tests; read > DELIVERY_WORKFLOW at opening. Reconcile merged PR135, later safety fixes and > current quality work against maintained dev/main; preserve occupied edits. > > Reuse Room, source-aware summary, signed capture/media/Jobs, Community/Trust/ > Moderation and existing vehicle/history/alert modules. Freeze B-BR-OPT/BUC-OPT > before behavior; pure RED → GREEN → REFACTOR and immediate affected negative/ > replay/concurrency/money/privacy/PostGIS/S3/migration-recovery checks, then > compilation/static/contracts/diff/secret review. Preserve ADR-021: no GPS > requirement, missing-location fraud or new proximity advantage. > > A scoped cache/validity/refresh/revalidation precedes B calibrated independent > confidence, then C selected history/alerts/estimated detour economy. No arbitrary > weights, false freshness, ANP substitution, fake route or speculative service/ > provider. Actual native/provider/production acceptance is separate. > > D is excluded: no receipt/NFC-e evidence, new private document verification/ > intake or business claim/management/portal code, stubs/migrations/SDKs, including > overlapping FQ/Profile/Premium labels. Reopening needs extreme consolidation > plus thousands of real clients and D selection, unless an explicit early > maintainer request names the D scope. Generic continuation is not an override. > Capture receipts, existing manual records and necessary existing privacy/ > security maintenance are outside this hold. > > Record exact commands/tested revision/outcomes and concise PROGRESS; proceed > from local checkpoints only within already authorized construction. No > per-stage PR/CI waits; final protected dev→main/Quick verification/review/ > guarded merge/wiki only when authorized. This handoff alone authorizes no > implementation/live provider/VPS/device/publication/release. ## D boundary Before OPT-D00, read [future D](docs-planning-FUTURE_EVIDENCE_BUSINESS_PLAN.md) and actual human selection; record satisfied normal gate or scoped early timing exception. Do not use A–C continuation to begin D, or request approval repeatedly for routine steps already covered by a future explicit scoped implementation request.