Repository navigation
Allow two incoming control links for Pump and Outlet - #2531
Conversation
|
If a link from flow demand to a connector is also called 'control' link, I would recommend to think of renaming to keep it user intuitive. This naming can cause confusion. Also I am not sure if the link from FlowDemand to Connenctor Node is really a "control" in the same sense. Possible options that I was thinking of:
We could also make it clear whether the link is expressing a demand/requirement vs. an actual control relationship:
Either way is fine by me. It's just that users may intuitively associate control link with Control node only. |
|
Yeah I can understand that using control link for demands can be a bit confusing. Though adding another link type just for that can also lead to extra confusion, because now users need to consider which one of 3 link types to choose, even though it doesn't help us to distinguish them at all apart from a better fit of the link type name. Also it would be quite breaking and we'd have to think about how to migrate old models. In a way This PR just attempts to unblock @guydup and clarify the docs a bit in the process. @Fati-Mon do you think this wording clarifies the current situation? If you want you can create a new issue about link types, I'd prefer not to tie it to this particular PR. |
|
Great work, thanks! |
Missed this in #2531. Also we only logged an error instead of throwing.
This also adds some custom CSS to freeze the first column of the tables on https://ribasim.org/reference/validation.html to make them easier to read, and clarifies the docs of control links.