New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Update health and safety procedures for the Tapestry #644

Open
jackie1050 opened this Issue Jan 6, 2018 · 4 comments

Comments

3 participants
@jackie1050

jackie1050 commented Jan 6, 2018

Update health and safety procedures for the Tapestry - these will need to bear in mind where equipment is situated etc. in the new building

@ghost

This comment has been minimized.

Show comment
Hide comment
@ghost

ghost Jan 21, 2018

Visited Code Club today and your name and DoES was mentioned so I have looked you up here.
My interest is all things Rasp. Pi but specifically robots coded in SCRATCH and STEM.
Recently retired from a career in secondary education. Self taught in SCRATCH specific for wheeled robots. Post 16 tutor in Lifelong Learning and WAS H&S (IOSH) officer in large secondary school. Can I help you? Can you help me? Perhaps we can arrange a get together. Peter.einig@btinternet.com.

ghost commented Jan 21, 2018

Visited Code Club today and your name and DoES was mentioned so I have looked you up here.
My interest is all things Rasp. Pi but specifically robots coded in SCRATCH and STEM.
Recently retired from a career in secondary education. Self taught in SCRATCH specific for wheeled robots. Post 16 tutor in Lifelong Learning and WAS H&S (IOSH) officer in large secondary school. Can I help you? Can you help me? Perhaps we can arrange a get together. Peter.einig@btinternet.com.

@jackie1050

This comment has been minimized.

Show comment
Hide comment
@jackie1050

jackie1050 Jan 25, 2018

Peter came to maker night tonight, and suggested that:

  • we move the extinguishers away from the laser cutters so that they are still accessible if there is a major fire
  • we look out for a metal cupboard for solvents, glues etc.

jackie1050 commented Jan 25, 2018

Peter came to maker night tonight, and suggested that:

  • we move the extinguishers away from the laser cutters so that they are still accessible if there is a major fire
  • we look out for a metal cupboard for solvents, glues etc.
@amcewen

This comment has been minimized.

Show comment
Hide comment
@amcewen

amcewen Feb 28, 2018

Member

Is there anything beyond "make sure there's a metal cupboard in the workshop area" and "put the Ultimakers in the metal server cabinet" that's needed before the move? If not, I'm going to label the metal cupboard in the main room and the server cabinet appropriately (once #673 is underway) and then drop the Move label from this issue.

Member

amcewen commented Feb 28, 2018

Is there anything beyond "make sure there's a metal cupboard in the workshop area" and "put the Ultimakers in the metal server cabinet" that's needed before the move? If not, I'm going to label the metal cupboard in the main room and the server cabinet appropriately (once #673 is underway) and then drop the Move label from this issue.

@amcewen

This comment has been minimized.

Show comment
Hide comment
@amcewen

amcewen May 8, 2018

Member

Presumably one of the things we should do as part of this is to ensure we have training materials available (particularly for the more dangerous kit) for the assorted tools in the workshop. Autodesk have just released the training material for all of their kit in Pier 9, so it might be worth cribbing from that.

Member

amcewen commented May 8, 2018

Presumably one of the things we should do as part of this is to ensure we have training materials available (particularly for the more dangerous kit) for the assorted tools in the workshop. Autodesk have just released the training material for all of their kit in Pier 9, so it might be worth cribbing from that.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment