Pavel Studeník edited this page Dec 11, 2015 · 8 revisions

GreenTea wiki

QE tools for processing data from beaker jobs.

Links to used projects.

  1. Beaker Project

Documentation

Quality Assurance

  • How to start Tests project

Screenshots

  1. List of jobs - show all jobs that run in the past (divide by date of run).

List of jobs

Database structure

ER diagram

Clone this wiki locally
You can’t perform that action at this time.
You signed in with another tab or window. Reload to refresh your session. You signed out in another tab or window. Reload to refresh your session.
Press h to open a hovercard with more details.