[SPARK-27065][CORE] avoid more than one active task set managers for a stage #23927

Closed
wants to merge 6 commits into from

Conversation

cloud-fan
Copy link
Contributor

@cloud-fan cloud-fan commented Mar 1, 2019

What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the code) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, #21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

#22806 and #23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, #21131 is still necessary, to avoid launching unnecessary tasks and fix SPARK-25250. #22806 and #23871 are its followups to fix the hole.

How was this patch tested?

existing tests.

@cloud-fan
Copy link
Contributor Author

cloud-fan commented Mar 1, 2019

cc @squito @pgandhi999 @Ngone51 @srowen

@cloud-fan
Copy link
Contributor Author

cloud-fan commented Mar 1, 2019

This fixes https://issues.apache.org/jira/browse/SPARK-25250 as well, because zombie TSM won't launch new tasks.

Update:
This PR does NOT fix https://issues.apache.org/jira/browse/SPARK-25250 . The newly created active TSM may still launch tasks for already finished partitions and waste resource.

// events for all the 10 partitions and thinks the stage is finished. If it's a shuffle stage
// and somehow it has missing map outputs, then DAGScheduler will resubmit it and create a
// TSM3 for it. As a stage can't have more than one active task set managers, we must mark
// TSM2 as zombie (it actually is).
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

If TSM3 is created just after TSM2 finished partition 10, so, how does TSM3 know about the finished partition 10?

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

It doesn't need to know, and Spark will just waste resource to run unnecessary tasks. The cluster will not crush.

That's why I said

After this PR, #21131 becomes a pure optimization, to avoid launching unnecessary tasks. #22806 and #23871 are still valuable to improve this optimization.

Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

If TSM here is for a result stage, so when TSM2 finished partition 10 which commited output to HDFS, TSM3 would throw TaskCommitDeniedException due to launch task for partition 10. And I think this is what #22806 and #23871 try to fix.

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This PR focuses on fixing the potential occurrence of java.lang.IllegalStateException: more than one active taskSet for stage, which is described in https://issues.apache.org/jira/browse/SPARK-23433 .

https://issues.apache.org/jira/browse/SPARK-25250 remains unfixed and will be addressed in #22806 or #23871 .

Note that, SPARK-23433 can crush the cluster, even #22806 or #23871 can fix it as well, we need a simple fix and backport to 2.3/2.4.

SPARK-25250 is just a matter of wasting resource, we can keep the fix in master only.

Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

That's make sense and the Update.

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Yep it makes sense to fix the issue that this PR addresses alongwith the other PR's for SPARK-25250.

@@ -123,7 +123,7 @@ private[spark] class TaskSetManager(
// state until all tasks have finished running; we keep TaskSetManagers that are in the zombie
// state in order to continue to track and account for the running tasks.
// TODO: We should kill any running task attempts when the task set manager becomes a zombie.
private[scheduler] var isZombie = false
@transient private[scheduler] var isZombie = false
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This is transient because ... if it's true then that fact shouldn't survive serialization?
Just wondering if volatile was what was meant.

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

previously, only the task completion/fail event can mutate it, which is in the task-result-getter thread.

Now, DAGScheduler can also mutate it via TaskSchedulerImpl.submitTasks, which is in the dag-scheduler-event-loop thread.

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

damn, mistyped it...

@SparkQA
Copy link

SparkQA commented Mar 1, 2019

Test build #102913 has finished for PR 23927 at commit 424a3c8.

  • This patch fails Spark unit tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@SparkQA
Copy link

SparkQA commented Mar 2, 2019

Test build #102935 has finished for PR 23927 at commit 53c6ed8.

  • This patch fails Spark unit tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@@ -201,30 +201,10 @@ class TaskSchedulerImplSuite extends SparkFunSuite with LocalSparkContext with B
// Even if one of the task sets has not-serializable tasks, the other task set should
// still be processed without error
taskScheduler.submitTasks(FakeTask.createTaskSet(1))
taskScheduler.submitTasks(taskSet)
Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

we can't have 2 active task set managers at the same time.

Copy link
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Maybe we shall just give it another stageId ?

taskDescriptions = taskScheduler.resourceOffers(multiCoreWorkerOffers).flatten
assert(taskDescriptions.map(_.executorId) === Seq("executor0"))
}

test("refuse to schedule concurrent attempts for the same stage (SPARK-8103)") {
Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

this part of code is reverted in this PR, so remove the test as well

Copy link
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This is fine, but do we also want to add a test case to ensure the new behavior will not break ?

@SparkQA
Copy link

SparkQA commented Mar 4, 2019

Test build #102965 has finished for PR 23927 at commit f94809d.

  • This patch fails due to an unknown error code, -9.
  • This patch merges cleanly.
  • This patch adds no public classes.

@dilipbiswal
Copy link
Contributor

retest this please

@SparkQA
Copy link

SparkQA commented Mar 4, 2019

Test build #102972 has finished for PR 23927 at commit f94809d.

  • This patch passes all tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

Copy link
Contributor

@jiangxb1987 jiangxb1987 left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

The changes LGTM, maybe we shall add a test case?

@@ -201,30 +201,10 @@ class TaskSchedulerImplSuite extends SparkFunSuite with LocalSparkContext with B
// Even if one of the task sets has not-serializable tasks, the other task set should
// still be processed without error
taskScheduler.submitTasks(FakeTask.createTaskSet(1))
taskScheduler.submitTasks(taskSet)
Copy link
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Maybe we shall just give it another stageId ?

taskDescriptions = taskScheduler.resourceOffers(multiCoreWorkerOffers).flatten
assert(taskDescriptions.map(_.executorId) === Seq("executor0"))
}

test("refuse to schedule concurrent attempts for the same stage (SPARK-8103)") {
Copy link
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This is fine, but do we also want to add a test case to ensure the new behavior will not break ?

@SparkQA
Copy link

SparkQA commented Mar 5, 2019

Test build #103022 has finished for PR 23927 at commit 0ca733d.

  • This patch fails due to an unknown error code, -9.
  • This patch merges cleanly.
  • This patch adds no public classes.

@viirya
Copy link
Member

viirya commented Mar 5, 2019

retest this please

// Mark all the existing TaskSetManagers of this stage as zombie, as we are adding a new one.
// This is necessary to handle a corner case. Let's say a stage has 10 partitions and has 2
// TaskSetManagers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10
// and it completes. TSM2 finishes tasks for partition 1-19, and thinks he is still active
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

typo: 1-9.

@SparkQA
Copy link

SparkQA commented Mar 5, 2019

Test build #103039 has finished for PR 23927 at commit 0ca733d.

  • This patch passes all tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@SparkQA
Copy link

SparkQA commented Mar 5, 2019

Test build #103046 has finished for PR 23927 at commit 07d7de9.

  • This patch fails Spark unit tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@cloud-fan
Copy link
Contributor Author

retest this please

Copy link
Contributor

@squito squito left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I agree this is a necessary change (no idea why I didn't do this in the first place, would have been much cleaner).

Just some book-keeping stuff -- I think from the discussion its clear that SPARK-25250 is not just an optimization after this, its still a necessary chance, can you update the PR description?

Also can you file a separate jira for this? I think its helpful to make it clear what is fixed in each maintenance version of spark.

@@ -123,7 +123,7 @@ private[spark] class TaskSetManager(
// state until all tasks have finished running; we keep TaskSetManagers that are in the zombie
// state in order to continue to track and account for the running tasks.
// TODO: We should kill any running task attempts when the task set manager becomes a zombie.
private[scheduler] var isZombie = false
@volatile private[scheduler] var isZombie = false
Copy link
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I don't think this is necessary. You still only touch isZombie with a lock on the TaskSchedulerImpl (everything in the TSM requires a lock on the TaskSchedulerImpl). Even before, there could be multiple task-result-getter threads interacting w/ this.

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

ah good catch!

@cloud-fan cloud-fan changed the title [SPARK-23433][CORE] avoid more than one active task set managers for a stage [SPARK-27065][CORE] avoid more than one active task set managers for a stage Mar 5, 2019
@cloud-fan
Copy link
Contributor Author

thanks all of you for the review! I've updated the PR description.

@SparkQA
Copy link

SparkQA commented Mar 5, 2019

Test build #103060 has finished for PR 23927 at commit 58f646e.

  • This patch fails Spark unit tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@squito
Copy link
Contributor

squito commented Mar 5, 2019

Jenkins, retest this please

@SparkQA
Copy link

SparkQA commented Mar 5, 2019

Test build #103058 has finished for PR 23927 at commit 07d7de9.

  • This patch passes all tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@SparkQA
Copy link

SparkQA commented Mar 6, 2019

Test build #103069 has finished for PR 23927 at commit 58f646e.

  • This patch passes all tests.
  • This patch merges cleanly.
  • This patch adds no public classes.

@squito
Copy link
Contributor

squito commented Mar 6, 2019

lgtm

asfgit pushed a commit that referenced this pull request Mar 6, 2019
…a stage

## What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the [code](https://github.com/apache/spark/blob/v2.4.0/core/src/main/scala/org/apache/spark/scheduler/DAGScheduler.scala#L1416-L1422)) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, #21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

#22806 and #23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, #21131 is still necessary, to avoid launching unnecessary tasks and fix [SPARK-25250](https://issues.apache.org/jira/browse/SPARK-25250 ). #22806 and #23871 are its followups to fix the hole.

## How was this patch tested?

existing tests.

Closes #23927 from cloud-fan/scheduler.

Authored-by: Wenchen Fan <wenchen@databricks.com>
Signed-off-by: Imran Rashid <irashid@cloudera.com>
(cherry picked from commit cb20fbc)
Signed-off-by: Imran Rashid <irashid@cloudera.com>
asfgit pushed a commit that referenced this pull request Mar 6, 2019
…a stage

## What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the [code](https://github.com/apache/spark/blob/v2.4.0/core/src/main/scala/org/apache/spark/scheduler/DAGScheduler.scala#L1416-L1422)) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, #21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

#22806 and #23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, #21131 is still necessary, to avoid launching unnecessary tasks and fix [SPARK-25250](https://issues.apache.org/jira/browse/SPARK-25250 ). #22806 and #23871 are its followups to fix the hole.

## How was this patch tested?

existing tests.

Closes #23927 from cloud-fan/scheduler.

Authored-by: Wenchen Fan <wenchen@databricks.com>
Signed-off-by: Imran Rashid <irashid@cloudera.com>
(cherry picked from commit cb20fbc)
Signed-off-by: Imran Rashid <irashid@cloudera.com>
@asfgit asfgit closed this in cb20fbc Mar 6, 2019
@squito
Copy link
Contributor

squito commented Mar 6, 2019

merged to master, 2.4, & 2.3. Thanks!

kai-chi pushed a commit to kai-chi/spark that referenced this pull request Jul 23, 2019
…a stage

## What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

apache#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the [code](https://github.com/apache/spark/blob/v2.4.0/core/src/main/scala/org/apache/spark/scheduler/DAGScheduler.scala#L1416-L1422)) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

apache#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, apache#21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

apache#22806 and apache#23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, apache#21131 is still necessary, to avoid launching unnecessary tasks and fix [SPARK-25250](https://issues.apache.org/jira/browse/SPARK-25250 ). apache#22806 and apache#23871 are its followups to fix the hole.

## How was this patch tested?

existing tests.

Closes apache#23927 from cloud-fan/scheduler.

Authored-by: Wenchen Fan <wenchen@databricks.com>
Signed-off-by: Imran Rashid <irashid@cloudera.com>
(cherry picked from commit cb20fbc)
Signed-off-by: Imran Rashid <irashid@cloudera.com>
kai-chi pushed a commit to kai-chi/spark that referenced this pull request Jul 25, 2019
…a stage

## What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

apache#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the [code](https://github.com/apache/spark/blob/v2.4.0/core/src/main/scala/org/apache/spark/scheduler/DAGScheduler.scala#L1416-L1422)) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

apache#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, apache#21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

apache#22806 and apache#23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, apache#21131 is still necessary, to avoid launching unnecessary tasks and fix [SPARK-25250](https://issues.apache.org/jira/browse/SPARK-25250 ). apache#22806 and apache#23871 are its followups to fix the hole.

## How was this patch tested?

existing tests.

Closes apache#23927 from cloud-fan/scheduler.

Authored-by: Wenchen Fan <wenchen@databricks.com>
Signed-off-by: Imran Rashid <irashid@cloudera.com>
(cherry picked from commit cb20fbc)
Signed-off-by: Imran Rashid <irashid@cloudera.com>
kai-chi pushed a commit to kai-chi/spark that referenced this pull request Aug 1, 2019
…a stage

## What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

apache#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the [code](https://github.com/apache/spark/blob/v2.4.0/core/src/main/scala/org/apache/spark/scheduler/DAGScheduler.scala#L1416-L1422)) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

apache#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, apache#21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

apache#22806 and apache#23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, apache#21131 is still necessary, to avoid launching unnecessary tasks and fix [SPARK-25250](https://issues.apache.org/jira/browse/SPARK-25250 ). apache#22806 and apache#23871 are its followups to fix the hole.

## How was this patch tested?

existing tests.

Closes apache#23927 from cloud-fan/scheduler.

Authored-by: Wenchen Fan <wenchen@databricks.com>
Signed-off-by: Imran Rashid <irashid@cloudera.com>
(cherry picked from commit cb20fbc)
Signed-off-by: Imran Rashid <irashid@cloudera.com>
sumwale pushed a commit to TIBCOSoftware/snappy-spark that referenced this pull request Jun 27, 2021
…a stage

## What changes were proposed in this pull request?

This is another attempt to fix the more-than-one-active-task-set-managers bug.

apache#17208 is the first attempt. It marks the TSM as zombie before sending a task completion event to DAGScheduler. This is necessary, because when the DAGScheduler gets the task completion event, and it's for the last partition, then the stage is finished. However, if it's a shuffle stage and it has missing map outputs, DAGScheduler will resubmit it(see the [code](https://github.com/apache/spark/blob/v2.4.0/core/src/main/scala/org/apache/spark/scheduler/DAGScheduler.scala#L1416-L1422)) and create a new TSM for this stage. This leads to more than one active TSM of a stage and fail.

This fix has a hole: Let's say a stage has 10 partitions and 2 task set managers: TSM1(zombie) and TSM2(active). TSM1 has a running task for partition 10 and it completes. TSM2 finishes tasks for partitions 1-9, and thinks he is still active because he hasn't finished partition 10 yet. However, DAGScheduler gets task completion events for all the 10 partitions and thinks the stage is finished. Then the same problem occurs: DAGScheduler may resubmit the stage and cause more than one actice TSM error.

apache#21131 fixed this hole by notifying all the task set managers when a task finishes. For the above case, TSM2 will know that partition 10 is already completed, so he can mark himself as zombie after partitions 1-9 are completed.

However, apache#21131 still has a hole: TSM2 may be created after the task from TSM1 is completed. Then TSM2 can't get notified about the task completion, and leads to the more than one active TSM error.

apache#22806 and apache#23871 are created to fix this hole. However the fix is complicated and there are still ongoing discussions.

This PR proposes a simple fix, which can be easy to backport: mark all existing task set managers as zombie when trying to create a new task set manager.

After this PR, apache#21131 is still necessary, to avoid launching unnecessary tasks and fix [SPARK-25250](https://issues.apache.org/jira/browse/SPARK-25250 ). apache#22806 and apache#23871 are its followups to fix the hole.

## How was this patch tested?

existing tests.

Closes apache#23927 from cloud-fan/scheduler.

Authored-by: Wenchen Fan <wenchen@databricks.com>
Signed-off-by: Imran Rashid <irashid@cloudera.com>
(cherry picked from commit cb20fbc)
Signed-off-by: Imran Rashid <irashid@cloudera.com>