Skip to content
Permalink
master
Switch branches/tags
Go to file
 
 
Cannot retrieve contributors at this time

Development plan / Milestones

after PDR

  • include long-slit spectroscopy
  • after final detector choice
    • possibly include Q band
    • more realistic implementation of detector noise (ELFN / non-linearity / non-reciprocity for Aquarius; correlated noise for Hawaii), dependent on final detector choice
  • N band: add emission from window and spiders
  • create simulated data suitable for development of prototypes of pipeline algorithms
  • Define direction of North/East in data cube (wish from Inga Kamp)

after FDR

  • simulate raw detector frames that mimic the format of METIS raw data and are ready to be processed by the pipeline demonstrator