Skip to content

Conversation

@mrz1836
Copy link
Collaborator

@mrz1836 mrz1836 commented Oct 16, 2025

What Changed

  • Updated 1 individual file(s) to synchronize with the source repository
  • Synchronized 1 file(s) from directory mappings
  • Applied file transformations and updates based on sync configuration
  • Brought target repository in line with source repository state at commit 16a14eb

Directory Synchronization Details

The following directories were synchronized:

.github/actions.github/actions

  • Files synced: 0
  • Files examined: 16
  • Files excluded: 0
  • Processing time: 3087ms

.vscode.vscode

  • Files synced: 0
  • Files examined: 4
  • Files excluded: 0
  • Processing time: 1899ms

.github/tech-conventions.github/tech-conventions

  • Files synced: 0
  • Files examined: 15
  • Files excluded: 0
  • Processing time: 3522ms

.github/ISSUE_TEMPLATE.github/ISSUE_TEMPLATE

  • Files synced: 0
  • Files examined: 3
  • Files excluded: 0
  • Processing time: 1606ms

.github/workflows.github/workflows

  • Files synced: 1
  • Files examined: 24
  • Files excluded: 0
  • Processing time: 2272ms

Performance Metrics

  • Files processed: 82 (2 changed, 0 deleted, 80 skipped)
  • Files attempted to change: 2 (go-broadcast processing)
  • File processing time: 9955ms

Why It Was Necessary

This synchronization ensures the target repository stays up-to-date with the latest changes from the configured source repository. The sync operation identifies and applies only the necessary file changes while maintaining consistency across repositories.

Testing Performed

  • Validated sync configuration and file mappings
  • Verified file transformations applied correctly
  • Confirmed no unintended changes were introduced
  • All automated checks and linters passed

Impact / Risk

  • Low Risk: Standard sync operation with established patterns
  • No Breaking Changes: File updates maintain backward compatibility
  • Performance: No impact on application performance
  • Dependencies: No dependency changes included in this sync

Copilot AI review requested due to automatic review settings October 16, 2025 21:36
@mrz1836 mrz1836 self-assigned this Oct 16, 2025
@mrz1836 mrz1836 added automated-sync Automated sync PR, e.g. from a fork or external repo automerge Label to automatically merge pull requests that meet all required conditions chore Simple dependency updates or version bumps labels Oct 16, 2025
@github-actions github-actions bot added size/S Small change (11–50 lines) update General updates labels Oct 16, 2025
Copy link

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull Request Overview

This PR synchronizes the target repository (bsv-blockchain/go-batcher) with the source repository (mrz1836/go-broadcast) at commit 828bb48. The changes optimize the go vet workflow execution and correct a package reference.

Key Changes:

  • Modified go vet execution to run sequentially instead of parallel to avoid memory issues
  • Corrected the magex installation path from magefile/mage to mrz1836/mage-x

Reviewed Changes

Copilot reviewed 2 out of 2 changed files in this pull request and generated 1 comment.

File Description
.github/workflows/fortress-code-quality.yml Changed go vet from parallel to sequential execution with per-package processing for memory optimization
.devcontainer.json Updated postStartCommand to install magex from the correct repository path

Tip: Customize your code reviews with copilot-instructions.md. Create the file or learn how to get started.

@sonarqubecloud
Copy link

@mrz1836 mrz1836 merged commit c5b4695 into master Oct 16, 2025
41 checks passed
@github-actions github-actions bot deleted the chore/sync-files-bsv-blockchain-20251016-173613-828bb48 branch October 16, 2025 21:59
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

automated-sync Automated sync PR, e.g. from a fork or external repo automerge Label to automatically merge pull requests that meet all required conditions chore Simple dependency updates or version bumps size/S Small change (11–50 lines) update General updates

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants