EEP Title Author Status Type Published
8
Milestones to Embulk v1.0, and versioning strategies to follow
dmikurube
Accepted
Standards Track
2024-02-27

Motivation

The Embulk core has completed the huge architectural transition through the Embulk v0.10 "development" series.

The stable production versions, v1.0, have come into our view, but we have not been very clear about when to declare v1.0.

The goal of this EEP is to clarify the milestones for Embulk v1.0, and to suggest future versioning strategies to follow v1.0.

Milestones to v1.0

The Embulk core v1.0 would be released when the following criteria are met.

  1. The Embulk core introduces a sub-command to install Maven-style plugins.
  2. A tool to install Maven-style plugins is released out of the Embulk core package.
  3. The new testing framework for Embulk plugins is ready with JUnit 5.
  4. Dependency libraries of the Embulk core are up-to-date.
  5. Dependency libraries of the built-in plugins are up-to-date.
  6. The Embulk core is tested to work on Java 11 and/or 17 with some major plugins.

The core and SPI version mapping through v0.11 - v1.1

The Embulk core and the Embulk SPI have different versioning strategies. Around v1.0, they would have the following versions.

All of these versions would work with at least Java 8.

Embulk core version Embulk SPI version Supported Java version
v0.11.* v0.11 8
v1.0.* v0.11 (or v0.12 with some minor compatible fixes) 8 or later
v1.1.* v1.0 (with removal of msgpack-core from embulk-spi) 8 or later

Versioning strategies to follow v1.0

Embulk SPI

The Embulk SPI has two-digit version numbers like v1.2.

The MAJOR version (the first digit of the version number) is incremented when the Embulk SPI has an incompatible change. The "incompatible change" includes the required Java version.

The MINOR version (the second digit of the version number) is incremented for any change in the Embulk SPI. The SPI does not have a PATCH version. The MINOR version would be incremented even if the SPI had only a very small trivial change.

Embulk core

The Embulk core has three-digit version numbers like v1.2.3. The versioning strategies after Embulk v1.1.* would give some respect to the Semantic Versioning 2.0.0, although it may not be very strict.

The MAJOR version

The MAJOR version (the first digit of the version number) is incremented when the Embulk core has an incompatible change, which includes the following cases.

  • A breaking SPI change where an existing plugin is expected to stop working. Note that v1.0.* to v1.1.* is an exception, as the plan to drop msgpack-core has already been announced.
  • The minimum Java version required for Embulk. In other words, the Embulk core version would be at least v2.*.* when Embulk requires Java 11, 17, or 21.

On the other hand, the MAJOR version may or may not be incremented when a core feature is removed or changed, including the following example cases.

  • Removal of a sub-command.
  • A change in the command-line format.
  • A change in the interpretation of Embulk System Properties.

In such a case, we'll consider whether we should increment the MAJOR version or not, depending on the case.

The MINOR version

The MINOR version (the second digit of the version number) is incremented when the Embulk core has something new and compatible, not just a bug fix.

The PATCH version

The PATCH version (the third digit of the version number) is incremented when the Embulk core has only a bug fix.

Copyright and License

This document is placed under the CC0-1.0-Universal license, whichever is more permissive.