Permalink
Commits on Jun 20, 2012
Commits on Jun 19, 2012
  1. Merge pull request #31 from ericmoritz/clj_version

    Clj version
    committed Jun 19, 2012
  2. Merge branch 'master' into clj

    Conflicts:
    	.gitignore
    committed Jun 19, 2012
  3. add clojure/netty server

    r4vi committed Jun 19, 2012
Commits on Jun 18, 2012
  1. Merge remote-tracking branch 'jlouis/jlouis-initial-R'

    Conflicts:
    	.gitignore
    committed Jun 18, 2012
  2. Volcano plots.

    jlouis committed Jun 18, 2012
  3. Use a trick from basho-bench.

    Automatically install missing packages.
    jlouis committed Jun 18, 2012
  4. Prefer log10 scales all over.

    Otherwise the trend is really hard to see...
    jlouis committed Jun 18, 2012
  5. Merge pull request #27 from jlouis/jlouis-initial-R

    Introduce R as a tool for graphing.
    committed Jun 18, 2012
  6. Introduce R as a tool for graphing.

    Introduce code for running a simple R script which produces a bar-plot
    of the connection timeouts. This is very simple, but it is a start.
    jlouis committed Jun 18, 2012
  7. Renamed the cluster node-ws and restored the original

    I have to verify this is an improvement before committing it as one
    committed Jun 18, 2012
  8. Merge pull request #25 from ericmoritz/eleveldb-logging

    Eleveldb logging
    committed Jun 18, 2012
  9. Merge remote-tracking branch 'origin/master' into eleveldb-logging

    Conflicts:
    	competition/wsdemo-ws.js
    committed Jun 18, 2012
  10. Move these scripts to bin/

    committed Jun 18, 2012
  11. Added a script to turn all leveldb events into CSV files

    The leveldb databases need to be in data/ and the output will go
    into results/{db_name}.events.csv
    committed Jun 18, 2012
Commits on Jun 17, 2012
  1. Merge pull request #24 from einaros/master

    updated configure_ubuntu to use node 0.7
    committed Jun 17, 2012
  2. Merge pull request #23 from einaros/master

    Add clustering to node.js' ws benchmark, to utilize more cores
    committed Jun 17, 2012
Commits on Jun 16, 2012
  1. Added a script to start the erlang wsdemo server

    Added a script to monitor memory usage
    Fixed the wsdemo-ws.js host name
    root committed Jun 16, 2012
  2. removed the old results

    root committed Jun 16, 2012