Skip to content
Branch: master
Find file History
Fetching latest commit…
Cannot retrieve the latest commit at this time.
Permalink
Type Name Latest commit message Commit time
..
Failed to load latest commit information.
vbz-delays-prototype
MiraiLabs_from-prototype-to-production_slides.pdf
README.md
step-by-step.md

README.md

Event 1 - From prototype to production - 24 Sept. 2019

Overview

In this workshop we will discuss and demonstrate typical steps for moving a prototype into a production setup, along with associated challenges and benefits. We will give an overview of possible components, tools and technologies involved in a target state, while showing some of them in action with a simple, concrete use-case example.

The example will be used throughout the workshop, to illustrate a working, end-to-end case of moving a prototype into production.

Schedule

3-hour workshop with a break, followed by some drinks and snacks.

  • 4:15 pm - doors open
  • 4:30 pm - welcome / workshop
  • 6:00 pm - short break
  • 7:30 pm - end of workshop / closing remarks
  • 7:40 pm - drinks & snacks (~ until 9:00 pm)

Details

Although the main topics are technology agnostic, for a practical illustration we will be referring to specific open source software and tools. In particular, the example will make use of the R programming language and the GitHub platform, however, experience with R is not required to follow the workshop.

The workshop has been structured such that it is easy to follow, with the key elements and steps demonstrated live. Materials will be made available and shared online, and we do hope to give you all the necessary ingredients to try things out yourself after the workshop!

References

Content

Material Description
MiraiLabs_from-prototype-to-production_slides.pdf Reference slides for workshop
vbz-delays-prototype R Markdown document with the exploratory code for downloading the data, manipulating and analysing it, and producing an output plot
miraisolutions/vbzdelays GitHub repository of the R package representing the outcome of the workshop
miraisolutions.github.io/vbzdelays GitHub Pages website representing the target product of the workshop
step-by-step.md Details of the technical steps demonstrated live during the workshop
You can’t perform that action at this time.