Skip to content

Conversation

@bplb
Copy link
Member

@bplb bplb commented May 9, 2025

Add a sentence to the specification of Path::toAbsolutePath indicating that the root component of the absolute path derived from a Path associated with the default provider is non-null.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change requires CSR request JDK-8356804 to be approved

Issues

  • JDK-8351415: (fs) Path::toAbsolutePath should specify if an absolute path has a root component (Bug - P4)
  • JDK-8356804: (fs) Path::toAbsolutePath should specify if an absolute path has a root component (CSR)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/25161/head:pull/25161
$ git checkout pull/25161

Update a local copy of the PR:
$ git checkout pull/25161
$ git pull https://git.openjdk.org/jdk.git pull/25161/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 25161

View PR using the GUI difftool:
$ git pr show -t 25161

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/25161.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented May 9, 2025

👋 Welcome back bpb! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented May 9, 2025

@bplb This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8351415: (fs) Path::toAbsolutePath should specify if an absolute path has a root component

Reviewed-by: alanb

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 50 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added the rfr Pull request is ready for review label May 9, 2025
@openjdk
Copy link

openjdk bot commented May 9, 2025

@bplb The following label will be automatically applied to this pull request:

  • nio

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.

@openjdk openjdk bot added the nio nio-dev@openjdk.org label May 9, 2025
@mlbridge
Copy link

mlbridge bot commented May 9, 2025

Webrevs

@AlanBateman
Copy link
Contributor

/csr

@openjdk openjdk bot added the csr Pull request needs approved CSR before integration label May 12, 2025
@openjdk
Copy link

openjdk bot commented May 12, 2025

@AlanBateman has indicated that a compatibility and specification (CSR) request is needed for this pull request.

@bplb please create a CSR request for issue JDK-8351415 with the correct fix version. This pull request cannot be integrated until the CSR request is approved.

Copy link
Contributor

@AlanBateman AlanBateman left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I think it is okay.

@bplb
Copy link
Member Author

bplb commented May 12, 2025

/csr

Created.

@openjdk openjdk bot added ready Pull request is ready to be integrated and removed csr Pull request needs approved CSR before integration labels May 12, 2025
@bplb
Copy link
Member Author

bplb commented May 13, 2025

/integrate

@openjdk
Copy link

openjdk bot commented May 13, 2025

Going to push as commit 0318e49.
Since your change was applied there have been 75 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label May 13, 2025
@openjdk openjdk bot closed this May 13, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels May 13, 2025
@openjdk
Copy link

openjdk bot commented May 13, 2025

@bplb Pushed as commit 0318e49.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@bplb bplb deleted the Path-getRoot-8351415 branch May 21, 2025 23:52
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

integrated Pull request has been integrated nio nio-dev@openjdk.org

Development

Successfully merging this pull request may close these issues.

2 participants