Skip to content

Conversation

@earthling-amzn
Copy link
Contributor

@earthling-amzn earthling-amzn commented Jul 9, 2025

Shenandoah has not product instrumentation to track evacuation performance. This change introduces more detail by categorizing each evacuation as young, old or promotion.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8361726: Shenandoah: More detailed evacuation instrumentation (Enhancement - P4)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/26222/head:pull/26222
$ git checkout pull/26222

Update a local copy of the PR:
$ git checkout pull/26222
$ git pull https://git.openjdk.org/jdk.git pull/26222/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 26222

View PR using the GUI difftool:
$ git pr show -t 26222

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/26222.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Jul 9, 2025

👋 Welcome back wkemper! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Jul 9, 2025

@earthling-amzn This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8361726: Shenandoah: More detailed evacuation instrumentation

Reviewed-by: ysr, kdnilsen

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 20 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added the rfr Pull request is ready for review label Jul 9, 2025
@openjdk
Copy link

openjdk bot commented Jul 9, 2025

@earthling-amzn The following labels will be automatically applied to this pull request:

  • hotspot-gc
  • shenandoah

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing lists. If you would like to change these labels, use the /label pull request command.

@openjdk openjdk bot added hotspot-gc hotspot-gc-dev@openjdk.org shenandoah shenandoah-dev@openjdk.org labels Jul 9, 2025
@mlbridge
Copy link

mlbridge bot commented Jul 9, 2025

Webrevs

Copy link
Contributor

@kdnilsen kdnilsen left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Thanks. This instrumentation is helpful in evaluating further proposed changes.

Copy link
Member

@ysramakrishna ysramakrishna left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Approved, modulo a few nits.

The extra detail is useful!

Shenandoah has product only instrumentation to track evacuation performance.

Did you mean to say non-product instead of product only above?

@openjdk
Copy link

openjdk bot commented Jul 23, 2025

@earthling-amzn this pull request can not be integrated into master due to one or more merge conflicts. To resolve these merge conflicts and update this pull request you can run the following commands in the local repository for your personal fork:

git checkout categorize-evacuations
git fetch https://git.openjdk.org/jdk.git master
git merge FETCH_HEAD
# resolve conflicts and follow the instructions given by git merge
git commit -m "Merge master"
git push

@openjdk openjdk bot added the merge-conflict Pull request has merge conflict with target branch label Jul 23, 2025
@openjdk openjdk bot removed the merge-conflict Pull request has merge conflict with target branch label Jul 23, 2025
// Record that the given thread has begun to evacuate an object of this size.
void begin_evacuation(Thread* thread, size_t bytes, ShenandoahAffiliation from, ShenandoahAffiliation to);

// Multiple threads may attempt to evacuate the same object, but only the succeeding thread will end the evacuation.
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Instead of only the succeeding thread will end the evacuation, I might say: the unique thread that is successful will end the evacuation. (Alternatively, replace "succeeding" with "successful"; the word "succeeding" as an adjective can be ambiguous in this context.)

@earthling-amzn
Copy link
Contributor Author

GHA failure on macos looks unrelated (test was running G1).

/integrate

@openjdk
Copy link

openjdk bot commented Jul 24, 2025

@earthling-amzn This pull request has not yet been marked as ready for integration.

@openjdk openjdk bot added the ready Pull request is ready to be integrated label Jul 25, 2025
@earthling-amzn
Copy link
Contributor Author

/integrate

@openjdk
Copy link

openjdk bot commented Jul 25, 2025

Going to push as commit e756c0d.
Since your change was applied there have been 20 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Jul 25, 2025
@openjdk openjdk bot closed this Jul 25, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Jul 25, 2025
@openjdk
Copy link

openjdk bot commented Jul 25, 2025

@earthling-amzn Pushed as commit e756c0d.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@earthling-amzn earthling-amzn deleted the categorize-evacuations branch October 7, 2025 17:05
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

hotspot-gc hotspot-gc-dev@openjdk.org integrated Pull request has been integrated shenandoah shenandoah-dev@openjdk.org

Development

Successfully merging this pull request may close these issues.

3 participants