Skip to content
This repository was archived by the owner on Feb 2, 2023. It is now read-only.

8241082: Upgrade IANA Language Subtag Registry data to 03-16-2020 version #217

Closed
wants to merge 1 commit into from

Conversation

yan-too
Copy link
Collaborator

@yan-too yan-too commented May 19, 2021

The change should be backported to 13u too, to keep it up to date. Applies cleanly, test do pass.


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change must be properly reviewed

Issue

  • JDK-8241082: Upgrade IANA Language Subtag Registry data to 03-16-2020 version

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.java.net/jdk13u-dev pull/217/head:pull/217
$ git checkout pull/217

Update a local copy of the PR:
$ git checkout pull/217
$ git pull https://git.openjdk.java.net/jdk13u-dev pull/217/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 217

View PR using the GUI difftool:
$ git pr show -t 217

Using diff file

Download this PR as a diff file:
https://git.openjdk.java.net/jdk13u-dev/pull/217.diff

@bridgekeeper
Copy link

bridgekeeper bot commented May 19, 2021

👋 Welcome back yan! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk openjdk bot changed the title Backport e5e24ad08091b1b256cbc064320766b24036daf0 8241082: Upgrade IANA Language Subtag Registry data to 03-16-2020 version May 19, 2021
@openjdk
Copy link

openjdk bot commented May 19, 2021

This backport pull request has now been updated with issue from the original commit.

@openjdk
Copy link

openjdk bot commented May 19, 2021

@yan-too This change now passes all automated pre-integration checks.

After integration, the commit message for the final commit will be:

8241082: Upgrade IANA Language Subtag Registry data to 03-16-2020 version

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated rfr Pull request is ready for review labels May 19, 2021
@yan-too
Copy link
Collaborator Author

yan-too commented May 19, 2021

/integrate

@openjdk openjdk bot closed this May 19, 2021
@openjdk openjdk bot added integrated Pull request has been integrated and removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels May 19, 2021
@openjdk
Copy link

openjdk bot commented May 19, 2021

@yan-too Pushed as commit ab400f7.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@yan-too yan-too deleted the iana-8241082 branch May 19, 2021 11:33
@mlbridge
Copy link

mlbridge bot commented May 19, 2021

Webrevs

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
backport clean integrated Pull request has been integrated
Development

Successfully merging this pull request may close these issues.

1 participant