Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

8254982: (tz) Upgrade time-zone data to tzdata2020c #45

Closed
wants to merge 1 commit into from

Conversation

yan-too
Copy link
Collaborator

@yan-too yan-too commented Dec 3, 2020

It is time to backport tzdata2020c here, too. The patch applies without any adjustment. All relevant tests pass.


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change must be properly reviewed

Issue

  • JDK-8254982: (tz) Upgrade time-zone data to tzdata2020c

Reviewers

Download

$ git fetch https://git.openjdk.java.net/jdk13u-dev pull/45/head:pull/45
$ git checkout pull/45

@bridgekeeper
Copy link

bridgekeeper bot commented Dec 3, 2020

👋 Welcome back yan! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk openjdk bot changed the title Backport 55a0cad82751940076aa56e7644fb812d6cad3ba 8254982: (tz) Upgrade time-zone data to tzdata2020c Dec 3, 2020
@openjdk
Copy link

openjdk bot commented Dec 3, 2020

This backport pull request has now been updated with issue from the original commit.

@openjdk
Copy link

openjdk bot commented Dec 3, 2020

@yan-too This change now passes all automated pre-integration checks.

After integration, the commit message for the final commit will be:

8254982: (tz) Upgrade time-zone data to tzdata2020c

Reviewed-by: dcherepanov

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated rfr Pull request is ready for review labels Dec 3, 2020
@mlbridge
Copy link

mlbridge bot commented Dec 3, 2020

Webrevs

@yan-too
Copy link
Collaborator Author

yan-too commented Dec 3, 2020

/integrate

@openjdk openjdk bot closed this Dec 3, 2020
@openjdk openjdk bot added integrated Pull request has been integrated and removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Dec 3, 2020
@openjdk
Copy link

openjdk bot commented Dec 3, 2020

@yan-too Pushed as commit 28cc6c2.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@yan-too yan-too deleted the tzc-8254982 branch Dec 3, 2020
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
backport clean integrated Pull request has been integrated
2 participants