Skip to content
This repository has been archived by the owner on Sep 2, 2022. It is now read-only.

8261022: Fix incorrect result of Math.abs() with char type #34

Closed
wants to merge 1 commit into from

Conversation

RealCLanger
Copy link
Contributor

@RealCLanger RealCLanger commented Feb 19, 2021

Backport JDK-8261022


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change must be properly reviewed

Issue

  • JDK-8261022: Fix incorrect result of Math.abs() with char type

Download

$ git fetch https://git.openjdk.java.net/jdk16u pull/34/head:pull/34
$ git checkout pull/34

@bridgekeeper
Copy link

bridgekeeper bot commented Feb 19, 2021

👋 Welcome back clanger! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk openjdk bot changed the title Backport 7a2db858e0e81f2ba17c3554386bb6a833318b3d 8261022: Fix incorrect result of Math.abs() with char type Feb 19, 2021
@openjdk
Copy link

openjdk bot commented Feb 19, 2021

This backport pull request has now been updated with issue from the original commit.

@openjdk
Copy link

openjdk bot commented Feb 19, 2021

@RealCLanger This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8261022: Fix incorrect result of Math.abs() with char type

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated rfr Pull request is ready for review labels Feb 19, 2021
@RealCLanger
Copy link
Contributor Author

/integrate

@openjdk openjdk bot closed this Feb 19, 2021
@openjdk openjdk bot added integrated Pull request has been integrated and removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Feb 19, 2021
@openjdk
Copy link

openjdk bot commented Feb 19, 2021

@RealCLanger Pushed as commit 9d0adb8.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@RealCLanger RealCLanger deleted the backport-8261022 branch February 19, 2021 12:31
@mlbridge
Copy link

mlbridge bot commented Feb 19, 2021

Webrevs

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
backport clean integrated Pull request has been integrated
1 participant