Skip to content
This repository has been archived by the owner on Sep 2, 2022. It is now read-only.

8253702: BigSur version number reported as 10.16, should be 11.nn #35

Closed
wants to merge 1 commit into from

Conversation

RealCLanger
Copy link
Contributor

@RealCLanger RealCLanger commented Feb 19, 2021

Backport JDK-8253702


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change must be properly reviewed

Issue

  • JDK-8253702: BigSur version number reported as 10.16, should be 11.nn

Download

$ git fetch https://git.openjdk.java.net/jdk16u pull/35/head:pull/35
$ git checkout pull/35

@bridgekeeper
Copy link

bridgekeeper bot commented Feb 19, 2021

👋 Welcome back clanger! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk openjdk bot changed the title Backport 66757750a2adf0739d0f5bf98a3f50a123b7adcf 8253702: BigSur version number reported as 10.16, should be 11.nn Feb 19, 2021
@openjdk
Copy link

openjdk bot commented Feb 19, 2021

This backport pull request has now been updated with issue from the original commit.

@openjdk
Copy link

openjdk bot commented Feb 19, 2021

@RealCLanger This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8253702: BigSur version number reported as 10.16, should be 11.nn

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated rfr Pull request is ready for review labels Feb 19, 2021
@mlbridge
Copy link

mlbridge bot commented Feb 19, 2021

Webrevs

@RealCLanger
Copy link
Contributor Author

/integrate

@openjdk openjdk bot closed this Feb 19, 2021
@openjdk openjdk bot added integrated Pull request has been integrated and removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Feb 19, 2021
@openjdk
Copy link

openjdk bot commented Feb 19, 2021

@RealCLanger Pushed as commit c727528.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@RealCLanger RealCLanger deleted the backport-8253702 branch February 19, 2021 18:18
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
backport clean integrated Pull request has been integrated
1 participant