Skip to content
This repository was archived by the owner on Feb 2, 2023. It is now read-only.

Conversation

@TobiHartmann
Copy link
Member

@TobiHartmann TobiHartmann commented Jun 21, 2022

Backport of JDK-8287432. Applies cleanly. Approval is pending.

Thanks,
Tobias


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8287432: C2: assert(tn->in(0) != __null) failed: must have live top node

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk18u pull/165/head:pull/165
$ git checkout pull/165

Update a local copy of the PR:
$ git checkout pull/165
$ git pull https://git.openjdk.org/jdk18u pull/165/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 165

View PR using the GUI difftool:
$ git pr show -t 165

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk18u/pull/165.diff

@bridgekeeper
Copy link

bridgekeeper bot commented Jun 21, 2022

👋 Welcome back thartmann! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk openjdk bot changed the title Backport 78d371266ae8a629db8176ced4d48e9521702cce 8287432: C2: assert(tn->in(0) != __null) failed: must have live top node Jun 21, 2022
@openjdk
Copy link

openjdk bot commented Jun 21, 2022

This backport pull request has now been updated with issue from the original commit.

@openjdk
Copy link

openjdk bot commented Jun 21, 2022

@TobiHartmann This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8287432: C2: assert(tn->in(0) != __null) failed: must have live top node

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated rfr Pull request is ready for review labels Jun 21, 2022
@mlbridge
Copy link

mlbridge bot commented Jun 21, 2022

Webrevs

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

backport clean ready Pull request is ready to be integrated rfr Pull request is ready for review

Development

Successfully merging this pull request may close these issues.

2 participants