Skip to content

Conversation

@satyenme
Copy link

@satyenme satyenme commented Aug 2, 2025

Backporting JDK-8310264: In PhaseChaitin::Split defs and phis are leaked. Currently, defs and phis are leaked as they are resource allocated but not protected by a ResourceMark. Fixes memory leak conservatively.


Progress

  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • JDK-8310264 needs maintainer approval

Issue

  • JDK-8310264: In PhaseChaitin::Split defs and phis are leaked (Bug - P4 - Approved)

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk21u-dev.git pull/2030/head:pull/2030
$ git checkout pull/2030

Update a local copy of the PR:
$ git checkout pull/2030
$ git pull https://git.openjdk.org/jdk21u-dev.git pull/2030/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 2030

View PR using the GUI difftool:
$ git pr show -t 2030

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk21u-dev/pull/2030.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Aug 2, 2025

👋 Welcome back ssubramaniam! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Aug 2, 2025

@satyenme This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8310264: In PhaseChaitin::Split defs and phis are leaked

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title Backport 02b17d793bfcea611c654049c9ab680b70fb5685 8310264: In PhaseChaitin::Split defs and phis are leaked Aug 2, 2025
@openjdk
Copy link

openjdk bot commented Aug 2, 2025

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required labels Aug 2, 2025
@openjdk
Copy link

openjdk bot commented Aug 2, 2025

⚠️ @satyenme This change is now ready for you to apply for maintainer approval. This can be done directly in each associated issue or by using the /approval command.

@openjdk openjdk bot added the rfr Pull request is ready for review label Aug 2, 2025
@mlbridge
Copy link

mlbridge bot commented Aug 2, 2025

Webrevs

@satyenme
Copy link
Author

satyenme commented Aug 2, 2025

/approval request for backport of JDK-8310264: In PhaseChaitin::Split defs and phis are leaked

Motivation: Without this change, there's a possibility the append_entry value could overflow. With this fix, adds a check for problematic cases and fails fast.

Risk: Low-ish. Ran GHA Sanity Checks, local Tier 1 and 2, and tests listed on original PR directly. Patch is clean. Change has been present in tip since February, 2024.

@openjdk
Copy link

openjdk bot commented Aug 2, 2025

@satyenme
8310264: The approval request has been created successfully.

@openjdk openjdk bot added approval Requires approval; will be removed when approval is received ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Aug 2, 2025
@satyenme
Copy link
Author

satyenme commented Aug 6, 2025

/integrate

@openjdk
Copy link

openjdk bot commented Aug 6, 2025

Going to push as commit 2ae23bd.
Since your change was applied there have been 15 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Aug 6, 2025
@openjdk openjdk bot closed this Aug 6, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Aug 6, 2025
@openjdk
Copy link

openjdk bot commented Aug 6, 2025

@satyenme Pushed as commit 2ae23bd.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

1 participant