Skip to content

8319570: Change to GCC 13.2.0 for building on Linux at Oracle#2253

Closed
GoeLin wants to merge 1 commit intoopenjdk:masterfrom
GoeLin:goetz_backport_8319570
Closed

8319570: Change to GCC 13.2.0 for building on Linux at Oracle#2253
GoeLin wants to merge 1 commit intoopenjdk:masterfrom
GoeLin:goetz_backport_8319570

Conversation

@GoeLin
Copy link
Member

@GoeLin GoeLin commented Sep 22, 2025

I backport this for parity with 21.0.7-oracle.

Resolved some chunks due to context.

This should not change any existing build setup, just bring the possibility
to generate a devkit with gcc 13.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • JDK-8319570 needs maintainer approval

Issue

  • JDK-8319570: Change to GCC 13.2.0 for building on Linux at Oracle (Enhancement - P4 - Approved)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk21u-dev.git pull/2253/head:pull/2253
$ git checkout pull/2253

Update a local copy of the PR:
$ git checkout pull/2253
$ git pull https://git.openjdk.org/jdk21u-dev.git pull/2253/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 2253

View PR using the GUI difftool:
$ git pr show -t 2253

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk21u-dev/pull/2253.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Sep 22, 2025

👋 Welcome back goetz! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Sep 22, 2025

@GoeLin This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8319570: Change to GCC 13.2.0 for building on Linux at Oracle

Reviewed-by: mdoerr, phh

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 28 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title backport 1802cb566e956febebc181da26a666bea4942e87 8319570: Change to GCC 13.2.0 for building on Linux at Oracle Sep 22, 2025
@openjdk
Copy link

openjdk bot commented Sep 22, 2025

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base rfr Pull request is ready for review labels Sep 22, 2025
@mlbridge
Copy link

mlbridge bot commented Sep 22, 2025

Webrevs

Copy link
Contributor

@TheRealMDoerr TheRealMDoerr left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM.

@openjdk
Copy link

openjdk bot commented Sep 23, 2025

⚠️ @GoeLin This change is now ready for you to apply for maintainer approval. This can be done directly in each associated issue or by using the /approval command.

@openjdk openjdk bot added the approval Requires approval; will be removed when approval is received label Sep 23, 2025
@openjdk openjdk bot added ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Sep 26, 2025
@GoeLin
Copy link
Member Author

GoeLin commented Sep 26, 2025

/integrate

@openjdk
Copy link

openjdk bot commented Sep 26, 2025

Going to push as commit 42cccb1.
Since your change was applied there have been 28 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Sep 26, 2025
@openjdk openjdk bot closed this Sep 26, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Sep 26, 2025
@openjdk
Copy link

openjdk bot commented Sep 26, 2025

@GoeLin Pushed as commit 42cccb1.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@GoeLin GoeLin deleted the goetz_backport_8319570 branch September 26, 2025 08:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

3 participants