Skip to content

8328247: Remove redundant dir for tests converted from applet to main#2276

Closed
satyenme wants to merge 1 commit intoopenjdk:masterfrom
satyenme:8328247-clean
Closed

8328247: Remove redundant dir for tests converted from applet to main#2276
satyenme wants to merge 1 commit intoopenjdk:masterfrom
satyenme:8328247-clean

Conversation

@satyenme
Copy link

@satyenme satyenme commented Sep 29, 2025

Backporting JDK-8328247: Remove redundant dir for tests converted from applet to main. Renames three javax swing tests, as per change accepted by Oracle.


Progress

  • JDK-8328247 needs maintainer approval
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8328247: Remove redundant dir for tests converted from applet to main (Bug - P4 - Approved)

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk21u-dev.git pull/2276/head:pull/2276
$ git checkout pull/2276

Update a local copy of the PR:
$ git checkout pull/2276
$ git pull https://git.openjdk.org/jdk21u-dev.git pull/2276/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 2276

View PR using the GUI difftool:
$ git pr show -t 2276

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk21u-dev/pull/2276.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Sep 29, 2025

👋 Welcome back ssubramaniam! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Sep 29, 2025

@satyenme This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8328247: Remove redundant dir for tests converted from applet to main

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 2 new commits pushed to the master branch:

  • f47a350: 8347277: java/awt/Focus/ComponentLostFocusTest.java fails intermittently
  • 574990f: 8320049: PKCS10 would not discard the cause when throw SignatureException on invalid key

Please see this link for an up-to-date comparison between the source branch of this pull request and the master branch.
As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title Backport ece4124f25f676da9bf2d1b7fd8e4394dd7d31af 8328247: Remove redundant dir for tests converted from applet to main Sep 29, 2025
@openjdk
Copy link

openjdk bot commented Sep 29, 2025

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required approval Requires approval; will be removed when approval is received rfr Pull request is ready for review labels Sep 29, 2025
@mlbridge
Copy link

mlbridge bot commented Sep 29, 2025

Webrevs

@openjdk openjdk bot added ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Oct 1, 2025
@satyenme
Copy link
Author

satyenme commented Oct 1, 2025

/integrate

@openjdk
Copy link

openjdk bot commented Oct 1, 2025

Going to push as commit 04046b1.
Since your change was applied there have been 4 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Oct 1, 2025
@openjdk openjdk bot closed this Oct 1, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Oct 1, 2025
@openjdk
Copy link

openjdk bot commented Oct 1, 2025

@satyenme Pushed as commit 04046b1.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

1 participant