Skip to content

Conversation

@gnu-andrew
Copy link
Member

@gnu-andrew gnu-andrew commented Apr 17, 2024

Sync jdk8u412-b08/jdk8u412-ga


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk8u-dev.git pull/482/head:pull/482
$ git checkout pull/482

Update a local copy of the PR:
$ git checkout pull/482
$ git pull https://git.openjdk.org/jdk8u-dev.git pull/482/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 482

View PR using the GUI difftool:
$ git pr show -t 482

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk8u-dev/pull/482.diff

Alexey Bakhtin and others added 6 commits April 7, 2024 02:34
Reviewed-by: mbalao, andrew
Backport-of: 62d9cec1d6b804a70381bfb8ac902b6bb649f8ae
Reviewed-by: andrew
Backport-of: 87dfeeb14fdd0fa1648a8bec91b5b713cc2c1b83
Co-authored-by: Alexey Bakhtin <alexey@azul.com>
Co-authored-by: Martin Balao <mbalao@redhat.com>
Reviewed-by: fferrari, andrew
Co-authored-by: Andrew Brygin <bae@openjdk.org>
Reviewed-by: aph, andrew
Backport-of: 1a4a46e102a2bc282fcbec571169867d715f4ade
Reviewed-by: roland, andrew
Backport-of: a5818972c16bd883d768ff2fb23a8aa9e0142c65
Added tag jdk8u412-ga for changeset 43cb875
@bridgekeeper
Copy link

bridgekeeper bot commented Apr 17, 2024

👋 Welcome back andrew! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Apr 17, 2024

@gnu-andrew This change now passes all automated pre-integration checks.

After integration, the commit message for the final commit will be:

Merge

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated clean Identical backport; no merge resolution required rfr Pull request is ready for review labels Apr 17, 2024
@gnu-andrew
Copy link
Member Author

Failures are a Certigna certificate test and an Ubuntu outage causing package download failures.
Neither are related to the merge.
/integrate

@openjdk
Copy link

openjdk bot commented Apr 17, 2024

Going to push as commit 0e0b018.

@openjdk openjdk bot added the integrated Pull request has been integrated label Apr 17, 2024
@openjdk openjdk bot closed this Apr 17, 2024
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Apr 17, 2024
@openjdk
Copy link

openjdk bot commented Apr 17, 2024

@gnu-andrew Pushed as commit 0e0b018.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

clean Identical backport; no merge resolution required integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants