Skip to content

Conversation

@gnu-andrew
Copy link
Member

@gnu-andrew gnu-andrew commented Oct 1, 2024

Sync jdk8u432-b05


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk8u-dev.git pull/587/head:pull/587
$ git checkout pull/587

Update a local copy of the PR:
$ git checkout pull/587
$ git pull https://git.openjdk.org/jdk8u-dev.git pull/587/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 587

View PR using the GUI difftool:
$ git pr show -t 587

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk8u-dev/pull/587.diff

franferrax and others added 2 commits September 20, 2024 10:44
…nchored by Entrust Root CAs

Reviewed-by: sgehwolf, andrew
Backport-of: 7d49c52272b54070a13b02708dd7ce5f8e375a06
@bridgekeeper
Copy link

bridgekeeper bot commented Oct 1, 2024

👋 Welcome back andrew! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Oct 1, 2024

@gnu-andrew This change now passes all automated pre-integration checks.

After integration, the commit message for the final commit will be:

Merge

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added ready Pull request is ready to be integrated clean Identical backport; no merge resolution required rfr Pull request is ready for review labels Oct 1, 2024
@gnu-andrew
Copy link
Member Author

/integrate

@openjdk
Copy link

openjdk bot commented Oct 2, 2024

Going to push as commit 13e86fb.

@openjdk openjdk bot added the integrated Pull request has been integrated label Oct 2, 2024
@openjdk openjdk bot closed this Oct 2, 2024
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Oct 2, 2024
@openjdk
Copy link

openjdk bot commented Oct 2, 2024

@gnu-andrew Pushed as commit 13e86fb.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

clean Identical backport; no merge resolution required integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants