Skip to content

8366877: Change JavaFX release version to 21.0.9 in jfx21u#101

Closed
johanvos wants to merge 1 commit intoopenjdk:masterfrom
johanvos:8366877-2109
Closed

8366877: Change JavaFX release version to 21.0.9 in jfx21u#101
johanvos wants to merge 1 commit intoopenjdk:masterfrom
johanvos:8366877-2109

Conversation

@johanvos
Copy link
Contributor

@johanvos johanvos commented Sep 4, 2025

Increase the version to 21.0.9


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • JDK-8366877 needs maintainer approval

Issue

  • JDK-8366877: Change JavaFX release version to 21.0.9 in jfx21u (Task - P2 - Approved)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jfx21u.git pull/101/head:pull/101
$ git checkout pull/101

Update a local copy of the PR:
$ git checkout pull/101
$ git pull https://git.openjdk.org/jfx21u.git pull/101/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 101

View PR using the GUI difftool:
$ git pr show -t 101

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jfx21u/pull/101.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Sep 4, 2025

👋 Welcome back jvos! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Sep 4, 2025

@johanvos This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8366877: Change JavaFX release version to 21.0.9 in jfx21u

Reviewed-by: jpereda

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added the rfr Pull request is ready for review label Sep 4, 2025
@mlbridge
Copy link

mlbridge bot commented Sep 4, 2025

Webrevs

@openjdk openjdk bot added approval Requires approval; will be removed when approval is received ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Sep 4, 2025
@johanvos
Copy link
Contributor Author

johanvos commented Sep 4, 2025

/integrate

@openjdk
Copy link

openjdk bot commented Sep 4, 2025

Going to push as commit 7613c1c.

@openjdk openjdk bot added the integrated Pull request has been integrated label Sep 4, 2025
@openjdk openjdk bot closed this Sep 4, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Sep 4, 2025
@openjdk
Copy link

openjdk bot commented Sep 4, 2025

@johanvos Pushed as commit 7613c1c.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants