Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

vcs: add method Repository.deleteUntrackedFiles #732

Closed
wants to merge 1 commit into from

Conversation

edvbld
Copy link
Member

@edvbld edvbld commented Aug 24, 2020

Hi all,

please review this patch that adds a new method to Repository - deleteUntrackedFiles. As the name suggests, the new method deletes all untracked files in a repository. This is useful when you want to clean up a repository after for example a revert.

Testing:

  • make test passes on Linux x64
  • Added a new unit test

Thanks,
Erik


Progress

  • Change must not contain extraneous whitespace
  • Change must be properly reviewed

Reviewers

Download

$ git fetch https://git.openjdk.java.net/skara pull/732/head:pull/732
$ git checkout pull/732

@bridgekeeper
Copy link

@bridgekeeper bridgekeeper bot commented Aug 24, 2020

👋 Welcome back ehelin! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request.

@openjdk openjdk bot added the rfr label Aug 24, 2020
Copy link
Member

@rwestberg rwestberg left a comment

Looks good!

@openjdk
Copy link

@openjdk openjdk bot commented Aug 24, 2020

@edvbld This change now passes all automated pre-integration checks. When the change also fulfills all project specific requirements, type /integrate in a new comment to proceed. After integration, the commit message will be:

vcs: add method Repository.deleteUntrackedFiles

Reviewed-by: rwestberg
  • If you would like to add a summary, use the /summary command.
  • To credit additional contributors, use the /contributor command.
  • To add additional solved issues, use the /issue command.

There are currently no new commits on the master branch since the last update of the source branch of this PR. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you would like to avoid potential automatic rebasing, specify the current head hash when integrating, like this: /integrate cfaa08273b267044ff46f29763f9a5234c187339.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added the ready label Aug 24, 2020
@edvbld
Copy link
Member Author

@edvbld edvbld commented Aug 24, 2020

/integrate

@openjdk openjdk bot closed this Aug 24, 2020
@openjdk openjdk bot added integrated and removed ready labels Aug 24, 2020
@openjdk
Copy link

@openjdk openjdk bot commented Aug 24, 2020

@edvbld
Pushed as commit b15e755.

@openjdk openjdk bot removed the rfr label Aug 24, 2020
@mlbridge
Copy link

@mlbridge mlbridge bot commented Aug 24, 2020

Webrevs

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
2 participants