Commits on Oct 16, 2011
  1. @igrigorik

    bump to 0.9.3

    igrigorik committed Oct 16, 2011
  2. @igrigorik
  3. Fixing up specs for rack routes that were broken after commit a6d23db.…

    … Moved HEAD request api for /hello_world to its own mapping.
    Adam Watson committed Oct 16, 2011
Commits on Oct 14, 2011
  1. @igrigorik
Commits on Oct 13, 2011
  1. Removing automatic inclusion of HEAD mapping with GET mappings in api…

    … routes. These methods should be explicitly mapped instead of implicitly glommed and allowed.
    Adam Watson committed Oct 13, 2011
  2. @igrigorik

    Merge pull request #92 from mattmatt/master

    Fix a tiny typo that was leftover from the aroundware refactoring
    igrigorik committed Oct 13, 2011
  3. @roidrage
Commits on Oct 12, 2011
  1. @igrigorik

    Merge pull request #91 from scoreloop/master

    reload configuration on HUP signal
    igrigorik committed Oct 12, 2011
  2. @marcoow

    reload config on HUP

    trap the "HUP" signal and reload the
    configuration when it is sent (allows
    changing the config without restarting
    the server similar as Nginx does it)
    marcoow committed Oct 12, 2011
Commits on Oct 6, 2011
  1. @dj2

    Merge pull request #90 from adamlwatson/master

    Refactor config for content_stream.rb to work with amqp 0.8.0
    dj2 committed Oct 6, 2011
  2. Refactored to work with amqp 0.8.0. Using a queue-subscribe model ins…

    …tead of long polling for new messages.
    Adam Watson committed Oct 6, 2011
Commits on Oct 5, 2011
  1. @joshbuddy
  2. @joshbuddy
Commits on Oct 4, 2011
  1. @dj2

    Merge pull request #89 from pkieltyka/master

    Option in runner to bind to a unix domain socket
    dj2 committed Oct 4, 2011
  2. Add unix down socket support to runner

    Peter Kieltyka committed Oct 4, 2011
Commits on Oct 1, 2011
  1. @igrigorik
Commits on Sep 29, 2011
  1. @igrigorik

    document set_event_handler

    igrigorik committed Sep 29, 2011
  2. @igrigorik

    cleanup docs + example api

    igrigorik committed Sep 29, 2011
  3. @igrigorik

    Merge branch 'close-connection-on-error' of git://github.com/crohr/go…

    …liath into fast_close
    igrigorik committed Sep 29, 2011
  4. @igrigorik

    reverse if on start_tls

    igrigorik committed Sep 29, 2011
  5. @igrigorik
  6. @igrigorik

    split / fix multiple tests

    igrigorik committed Sep 29, 2011
  7. @igrigorik
  8. @igrigorik
Commits on Sep 20, 2011
  1. @igrigorik

    Merge pull request #86 from nviennot/master

    EM.epoll *must* be called before EM.run
    igrigorik committed Sep 20, 2011
  2. @nviennot
Commits on Sep 17, 2011
  1. @igrigorik

    Merge pull request #85 from poffe/heartbeat_options

    Added options to Goliath::Rack::Heartbeat
    igrigorik committed Sep 17, 2011
  2. @poffe

    Added options to Goliath::Rack::Heartbeat which takes optional heartb…

    …eat path endpoint and heartbeat response.
    poffe committed with Christoffer Lund Sep 17, 2011
Commits on Sep 14, 2011
  1. @igrigorik

    Merge pull request #84 from subelsky/master

    Add a small 3rd party API proxy example
    igrigorik committed Sep 13, 2011
Commits on Sep 13, 2011
  1. @subelsky

    add 3rd party API proxy example

    subelsky committed Sep 13, 2011
Commits on Sep 6, 2011
  1. @joshbuddy
Commits on Sep 5, 2011
  1. @joshbuddy
  2. @joshbuddy

    Merge branch 'new-api'

    Conflicts:
    	lib/goliath/connection.rb
    	lib/goliath/rack/builder.rb
    joshbuddy committed Sep 5, 2011
  3. @joshbuddy

    proper eventhandler passing

    joshbuddy committed Sep 5, 2011
  4. @joshbuddy