Skip to content

chore(backlog): add YYYY-MM-DD to CC-027/028/034 Outcome lines#62

Merged
screenleon merged 1 commit into
mainfrom
chore/backfill-outcome-dates-cc027-028-034
May 16, 2026
Merged

chore(backlog): add YYYY-MM-DD to CC-027/028/034 Outcome lines#62
screenleon merged 1 commit into
mainfrom
chore/backfill-outcome-dates-cc027-028-034

Conversation

@screenleon
Copy link
Copy Markdown
Owner

Summary

Backfill date tokens on closed-entry Outcome lines so they pass the strengthened closure-date rule landing in CC-030.

Why

CC-030 fix-round-1 (gate-20260516-195358 NO-GO follow-up) tightens E-CLOSURE-DATE-MISMATCH so the body-side closure date must appear in either a heading marker (✅ YYYY-MM-DD) OR a **Outcome**: line. The previous loose rule (any date anywhere in the section) was masking real drift on CC-027/028/034 — their Source lines coincidentally carried 2026-05-15 dates that the validator picked up.

Data-prep PR landed before the strengthened validator so main never goes through a state where validator output gains new tokens unexpectedly.

Test plan

  • bash /tmp/validate-new.sh BACKLOG.md (strengthened validator from feat/cc030) → only pre-existing 3 token set (E-AREA-ENUM, E-REFS-PREFIX, E-INDEX-MISMATCH). No new closure-date mismatches.
  • bash pm/scripts/validate.sh BACKLOG.md (current main validator) → unchanged token set.

🤖 Generated with Claude Code

CC-030 strengthened closure-date rule (heading marker OR **Outcome**:
line only) exposes drift: CC-027 and CC-028 Outcome lines lacked a
date token (previously masked by Source-line dates), and CC-034 had
no Outcome line at all.

Add `2026-05-15 —` prefix to existing CC-027 / CC-028 Outcome lines.
Add a new Outcome line for CC-034 (dated 2026-05-15, summarizing PR
#53 landing). No semantic change to history; only date metadata
needed by the strengthened validator.

Verified against the strengthened validator (from feat/cc030 branch):
emits only the pre-existing 3 token set (E-AREA-ENUM, E-REFS-PREFIX,
E-INDEX-MISMATCH). No new errors introduced.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@screenleon screenleon merged commit 2bf3a42 into main May 16, 2026
9 checks passed
@screenleon screenleon deleted the chore/backfill-outcome-dates-cc027-028-034 branch May 16, 2026 11:14
screenleon added a commit that referenced this pull request May 16, 2026
CC-030 fix-round-3 tightens the **Outcome** fallback regex to
require YYYY-MM-DD immediately after the `**Outcome**: ` literal.
CC-029's Outcome line currently reads
"**Outcome**: PR #57 合併 2026-05-15; ..." — date is mid-sentence,
no longer satisfies the closure-date evidence under the tightened
rule.

Reorder to "**Outcome**: 2026-05-15 — PR #57 合併; ...", matching
the canonical shape used by CC-027/028/034 in PR #62.

Verified against the strengthened validator from feat/cc030: token
set returns to the pre-existing 3-token baseline (E-AREA-ENUM,
E-REFS-PREFIX, E-INDEX-MISMATCH).

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant