Add a wrapper in gleam to time each gl call. #187
+28
−1
Merged
Travis CI / Travis CI - Pull Request
succeeded
Mar 7, 2019
in
4m 26s
Build Passed
The build passed, just like the previous build.
Details
This is a pull request build.
It is running a build against the merge commit, after merging #187 Add a wrapper in gleam to time each gl call..
Any changes that have been made to the master branch before the build ran are also included.
Jobs and Stages
This build has three jobs, running in parallel.
| Job | Rust | State |
|---|---|---|
| nightly | passed | |
| beta | passed | |
| stable | passed |
Build Configuration
| Build Option | Setting |
|---|---|
| Language | Rust |
| Operating System | Linux (Trusty) |
| Rust Versions | nightly, beta, stable |
Build Configuration
{
"os": "linux",
"dist": "trusty",
"rust": [
"nightly",
"beta",
"stable"
],
"group": "stable",
".result": "configured",
"language": "rust"
}