Building the living room bouldering wall

A bouldering wall is basically a floor that runs vertically, and ends up getting framed the same way. I didn't have a background in construction, but I did have the Metolius guide and an accomplice. I sketched up a rough model of the wall in Blender, along with some relevant house structure from the architectural drawings:

image

Basic design constraints + framing

The project wasn't entirely straightforward for a few reasons:

  1. I didn't want to remove any drywall; the bouldering wall needed to be removable, modulo a few holes.
  2. There's a baseboard heater running the length of the main wall, so the entire structure is hanging rather than supported from the floor.
  3. The house is split-level and the main wall is backed by concrete and/or interior wiring below 54" (so all supporting hardware needs to be above this level).
  4. The bouldering wall has a ceiling-mounted section, but I don't want to hang weight on the ceiling; instead, it's transferred down the diagonal.

I started out by installing a ridiculously overengineered 2x6 frame over the studs in the wall. Each 2x6 has three lag bolts in the top half, and the bottom half hangs. (This is structurally sound due to the tensile strength of wood parallel to the grain.)

The baseboard heater is 3kW and has aluminum fins spaced about 1/4" apart over a span of 13'. Conservatively estimating each fin at 2 square inches:

$ units -t '3 kW / (2 in^2 / 0.25 in * 13 ft)' 'kW/m^2'
3.725969

So no more than 4x full-sun heat density, which should be fine (i.e. won't ignite anything by convection).

image image

The ceiling section is also lagged into the structure, which is 12" OC 2x12 and supports the flat roof directly. Ultimately, though, the load gets transferred down the diagonal after about 1/4" of deflection.

image

Here's the top receiver for the diagonals. I had tried assembling the five 2x6 sections as a single piece, but it was too heavy to hold against the ceiling while drilling the bolt holes. Ended up doing it piece by piece and assembling once the ceiling boards were in place.

image image

Installed diagonals, which interestingly aren't fastened in any way. The joist hangers and routed slots in the main 2x6s hold them in place, and I figured any fasteners would only weaken the structure. I didn't take any pictures of the bottom diagonal receivers -- but they're routed 3/4" into the main boards so the diagonals rest on the wood grain; the joist hangers on the bottom don't take much load. (Also, 2x6 for the diagonal framing was way overkill in hindsight.)

image image

Paneling

It's common to use 3/4" plywood for the climbing surface, but that stuff is expensive and I wanted to try using OSB instead. This made the project about 30% cheaper and the extra weight didn't seem to cause any problems. It also has TruFlor logos all over it, which matches Joyce's interior decor aesthetic.

image

3/4" OSB is also quite strong under bending, as I found out when load testing:

image

Getting the holds mounted was straightforward enough. The first step was to chalkline a grid onto each panel:

image

Then I drilled out the grid points with small pilot holes. It's important to make the T-nut holes properly perpendicular to the surface, which even at 3/4" isn't guaranteed with a hand drill. I ended up using a plunge router to finish each hole, then conscripted an offspring for the hard part:

image

Two-dude final load test:

image

Yep, totally solid. (And very safe.)

image