-
Notifications
You must be signed in to change notification settings - Fork 4.7k
Pull requests: openshift/origin
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
CNTRLPLANE-5: Fix decoding of CBOR data in etcd test
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29614
opened Mar 20, 2025 by
bertinatto
Loading…
OCPBUGS-53014: Bump to kubernetes 1.32.3
e2e-images-update
Related to images used by e2e tests
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
vendor-update
Touching vendor dir or related files
#29612
opened Mar 20, 2025 by
dusk125
Loading…
TLS 1.3 / Modern profile tests
lgtm
Indicates that a PR is ready to be merged.
#29611
opened Mar 19, 2025 by
jacobsee
Loading…
OCPBUGS-53297: Disable:Broken for [sig-builds][Feature:Builds][Slow] can use private repositories as build input build using an HTTP token should be able to clone source code via an HTTP token
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29610
opened Mar 19, 2025 by
kunalmemane
Loading…
watch install times and provide and uplod file
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#29609
opened Mar 19, 2025 by
deads2k
Loading…
OCPBUGS-53285: Add/remove team members to the OWNERS file for Builds
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29608
opened Mar 19, 2025 by
kunalmemane
Loading…
TRT-1854: add synthetic test to check for presence of "Skipped" annotations in OTE tests
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29606
opened Mar 18, 2025 by
smg247
Loading…
[WIP] Nested container split
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#29605
opened Mar 18, 2025 by
bitoku
Loading…
Test PR
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#29602
opened Mar 17, 2025 by
xueqzhan
Loading…
NO-ISSUE: Automated - Update synthetic test data
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29600
opened Mar 14, 2025 by
openshift-bot
Loading…
MCO-1523: PinnedImageSet v1alpha1 Testing
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29599
opened Mar 13, 2025 by
RishabhSaini
Loading…
NE-1968: add e2e tests for FeatureGate GatewayAPI
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29597
opened Mar 11, 2025 by
lihongan
Loading…
(Work in progress) MCO-1520: Add MachineConfigNode e2e tests
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29596
opened Mar 10, 2025 by
isabella-janssen
•
Draft
[WIP] OCPNODE-2315: Add nested container test
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29594
opened Mar 10, 2025 by
bitoku
Loading…
[release-4.18] OCPBUGS-52496: use non-fake boot image for patch
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29584
opened Mar 6, 2025 by
openshift-cherrypick-robot
Loading…
Ensure OS environment variables are wired into Indicates a PR has been approved by an approver from all required OWNERS files.
list
command as well
approved
#29582
opened Mar 6, 2025 by
stbenjam
Loading…
OPRUN-3692: Olmv1-catalogd tests for API endpoints
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29580
opened Mar 5, 2025 by
anik120
Loading…
SPLAT-2060: Registered Machine API tests extension
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#29579
opened Mar 5, 2025 by
vr4manta
Loading…
WIP: add volume group snapshot tests
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
e2e-images-update
Related to images used by e2e tests
vendor-update
Touching vendor dir or related files
#29576
opened Mar 4, 2025 by
jsafrane
Loading…
Fix bearer token exposure in exit condition as well
#29575
opened Mar 4, 2025 by
Shilpa-Gokul
Loading…
NO-JIRA: look for high latency audit requests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#29571
opened Feb 28, 2025 by
neisw
Loading…
WIP: count watch requests using audit log
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#29568
opened Feb 27, 2025 by
bertinatto
Loading…
Update IPsec e2e test to validate NAT-T encapsulation option
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
vendor-update
Touching vendor dir or related files
#29563
opened Feb 25, 2025 by
pperiyasamy
Loading…
Backport Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
MetricsCollectionProfiles
patches to 4.18
approved
#29561
opened Feb 24, 2025 by
rexagod
Loading…
Previous Next
ProTip!
Add no:assignee to see everything that’s not assigned.