{{ project_name }} Design Doc

About this doc

Metadata about this document. Describe the scope and current status.

This doc describes the technical approach, milestones, and work planned for the [{{ project_name }}]({{ product_requirements_doc_link }}) linked to the Product Requirements Doc.


Sign off deadline

Date: {{ sign_off_deadline }}

Status

{{ status }}

Author(s)

{% for author in authors %}- {{ author }} {% endfor %}

Sign offs

{% for sign_off in sign_offs %}- {{ sign_off }} {% endfor %}

Add your name here to sign off.


Context

A sentence or two on the what—what is being built.

Then include the why—metrics we intend for. [Link to Product Requirements Doc]({{ product_requirements_doc_link }}) for details.


Non-goals

What is out of scope for this project that we don’t want to focus on?

{% for item in non_goals %}- {{ item }} {% endfor %}


Terminology

Define any new terms that are used in the document.


High-Level Approach

Explain the technical approach in a few sentences so the reader understands the system flow.


Alternatives Considered

Bullet points of alternative approaches considered and why they were not chosen.

{% for alternative in alternatives %}- {{ alternative }} {% endfor %}


Detailed Design

  • APIs
  • DB tables modified
  • Data models changed
  • Any diagrams that help the reader understand at a high level

Risks

What can go wrong with the proposed approach? How are we mitigating that?

{% for risk in risks %}- {{ risk }} {% endfor %}


Test Plan

How will this approach be tested?

  • Browser testing?
  • Manual testing?
  • Any tricky parts to test?

Adding information here also makes it easier to justify longer timelines.


Milestones

How will the work be divided into chunks of progress?

Focus on user milestones rather than technical ones. Example: having a minimal working feature behind a feature flag initially.

I usually add 1 week per 2 weeks of expected feature work.

{% for milestone in milestones %}- {{ milestone.name }}: {{ milestone.date }} {% endfor %}

Rough ETA of project finish date: {{ project_finish_eta }}

Project retro: {{ project_retro }}


Rollout Plan (Optional)

How will you gradually ramp up usage of the feature for safety?

{% for step in rollout_plan %}- {{ step }} {% endfor %}


Open Questions

Anything still being figured out that could use additional eyes or thoughts.


Parties Involved

Who is working on this? Are there any external teams that need to sign off?

{% for party in parties_involved %}- {{ party.role }}: {{ party.name }} {% endfor %}


Appendix

Add any detailed figures you didn’t want to inline for space.