-
Notifications
You must be signed in to change notification settings - Fork 169
Pull requests: openshift/ovn-kubernetes
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OCPBUGS-65658: Branch Sync release-4.20 to release-4.19 [11-14-2025]
jira/severity-critical
Referenced Jira bug's severity is critical for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#2862
opened Nov 14, 2025 by
openshift-pr-manager
bot
Loading…
NO-JIRA: Branch Sync release-4.19 to release-4.18 [11-14-2025]
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#2861
opened Nov 14, 2025 by
openshift-pr-manager
bot
Loading…
OCPBUGS-65618: [release-4.20] OCP4: 4.18.22 EgressIP Failover does not succeed - extended downtime and no reassignment between egress-capable peers
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/severity-critical
Referenced Jira bug's severity is critical for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2860
opened Nov 14, 2025 by
cgoncalves
Loading…
OCPBUGS-61285,OCPBUGS-57053: DownStream Merge [11-13-2025]
jira/severity-critical
Referenced Jira bug's severity is critical for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#2859
opened Nov 13, 2025 by
openshift-pr-manager
bot
Loading…
OCPBUGS-65569: [release-4.17]: kubevirt: fix bad release of IPs of live migratable pods
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#2857
opened Nov 13, 2025 by
jcaamano
Loading…
OCPBUGS-65514: [4.20] status manager: remove managedFields for deleted zone upon zone deletion
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2855
opened Nov 12, 2025 by
ricky-rav
Loading…
TEST: Igal/missing rules in dpu host mode
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
Add pr-retest slash command for retesting failed e2e jobs
#2840
opened Oct 31, 2025 by
jluhrsen
Loading…
DNM testing
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#2833
opened Oct 29, 2025 by
cgoncalves
•
Draft
[DNM] [FDP] [release-4.17] Pre-release testing for OVN 24.03.
#2830
opened Oct 27, 2025 by
linup2011
Loading…
[release-4.20] OCPBUGS-64836: back-port IP & MAC conflict detection
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2827
opened Oct 23, 2025 by
ormergi
Loading…
5 tasks
[wip] Fix GARP sending 0.0.0.0 due to incorrect IPv4 byte extraction
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
[wip] Handle failed CloudPrivateIPConfig assignments
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
[release-4.16] Bump OVS to 3.5
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#2795
opened Oct 9, 2025 by
kyrtapz
Loading…
[release-4.16] Bump OVS to 3.5, OVN to 25.03
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#2794
opened Oct 9, 2025 by
kyrtapz
Loading…
[release-4.17] Bump OVN to 25.03
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#2793
opened Oct 9, 2025 by
kyrtapz
Loading…
[DNM] Fix EIP reassignment on Namespace/Pod/EgressIP label updates
#2788
opened Oct 8, 2025 by
pperiyasamy
Loading…
DNM: Add openflow to drop traffic for nodePort service
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
verified
Signifies that the PR passed pre-merge verification criteria
verified-later
#2766
opened Sep 28, 2025 by
pliurh
Loading…
5 tasks
[WIP] Refactor: Simplify ACL rule to use positive matching
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#2765
opened Sep 25, 2025 by
venkataanil
Loading…
[DNM] Troubleshoot e2e-aws-ovn-windows CI failure
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2761
opened Sep 18, 2025 by
pperiyasamy
Loading…
[DNM] PRE Merge testing BGP IPV6
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
verified
Signifies that the PR passed pre-merge verification criteria
#2747
opened Sep 4, 2025 by
tssurya
Loading…
5 tasks
wip
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
Previous Next
ProTip!
Exclude everything labeled
bug with -label:bug.