Skip to content

Latest commit

 

History

History
17 lines (14 loc) · 1022 Bytes

team-build.rst

File metadata and controls

17 lines (14 loc) · 1022 Bytes

Build Team

We use mostly aluminum tubing for framing and arm/elevator mechanisms. Use a combindation of pre-dilled and solid sides. We try to minimize the number of bolt sizes. For some frabrication processes we use more rivets and plates for connecting parts. In 2021 we added a bench top mill, a Markforged 3D Printer in 2022, and a second Markforged 3D printer in late 2023 which have improved built quality and capabilities significantly.

Resources