Skip to content

Latest commit

 

History

History
17 lines (9 loc) · 1.26 KB

ordering_guide.md

File metadata and controls

17 lines (9 loc) · 1.26 KB

Open-Frame1 Ordering Guide

First screen you'll upload the fabrication files. Just upload the .zip file located /PCB/Board Fab Files/. At the bottom of this screen JLC asks if you want them to do any smt assembly which you should select.

Screen1_1Screen1_2

Next screen they ask for the BOM (Bill of Materials) spreadsheet and the CPL (tells them where to place the components) spreadsheet. Upload the 2 .xlsx files located in the same folder as the .zip.

Screen2_1

The next screen will ask which components you want them to assemble. The 24 pin connector is pretty much mandatory as you can't do it without a hot air station. The other 4 components are convenient.

Screen3_1

The next screen shows you a preview and from there you should be good to order. Initial renders of the part placement will likely be incorrect. THIS IS OK! If you selected yes to "confirm parts placement" on screen 1 jlc will reach out via email and fix the placements. You will need to confirm that the parts are correct similar to the image included.

Screen4_1Screen4_2