Skip to content

Latest commit

 

History

History
63 lines (53 loc) · 2.46 KB

create-assign-cost-allocation-policy-cost-control-unit.md

File metadata and controls

63 lines (53 loc) · 2.46 KB
title description author ms.author ms.topic ms.date ms.custom ms.reviewer audience ms.search.region ms.search.validFrom ms.search.form ms.dyn365.ops.version
Create and assign a cost allocation policy to a cost control unit
Use this procedure to create and assign a cost allocation policy and the corresponding rules to a cost control unit, including processes for creating policies and rules.
twheeloc
twheeloc
how-to
06/28/2017
twheeloc
Application User
Global
2016-06-30
CAMCostAccountingLedgerPolicyAssignment
AX 7.0.0

Create and assign a cost allocation policy to a cost control unit

[!include banner]

Use this procedure to create and assign a cost allocation policy and the corresponding rules to a cost control unit. This recording uses the USP2 demo data company.

Create a policy

  1. Go to Cost accounting > Policies > Cost allocation policies.
  2. Click New.
  3. In the Policy name field, type a value.
  4. In the Cost object dimension hierarchy field, enter or select a value.
    • Select Organization.
  5. In the Statistical dimension field, enter or select a value.
  6. Click Save.

Create allocation rules

  1. Click New.
  2. In the list, mark the selected row.
  3. In the Cost object dimension hierarchy node field, enter or select a value.
  4. In the Cost behavior field, select 'Total'.
  5. In the Allocation base field, enter or select a value.
  6. Click New.
  7. In the list, mark the selected row.
  8. In the Cost object dimension hierarchy node field, enter or select a value.
  9. In the Cost behavior field, select 'Total'.
  10. In the Allocation base field, enter or select a value.
  11. Click New.
  12. In the list, mark the selected row.
  13. In the Cost object dimension hierarchy node field, enter or select a value.
  14. In the Cost behavior field, select 'Total'.
  15. In the Allocation base field, enter or select a value.
    • Continue until you've created all the rules.
  16. Click Save.

Assign the policy to a cost control unit

  1. Click Policy assignments for cost control unit.
  2. Click New.
  3. In the list, mark the selected row.
  4. In the Valid from accounting date field, enter a date.
    • The rules are date-effective. A user or the system can expire the rules if a newer version is created.
  5. In the Cost control unit field, enter or select a value.
  6. Click Save.

[!INCLUDEfooter-include]