title | ms.date | monikerRange | ms.localizationpriority |
---|---|---|---|
Description Element |
03/14/2018 |
>= project-client-2010 || project-client-odc |
medium |
In OutlineCode, the description of the outline code.
In ExtendedAttribute, the description of the value in the list.
::: moniker range="project-client-odc"
In BoardColumn, the description of the board column element.
::: moniker-end
<Description>
StringValue(255)
</Description>
::: moniker range=">= project-client-2010"
::: moniker-end
::: moniker range="project-client-odc"
::: moniker-end
Minimum: 0 Maximum: 1 |
OutlineCode Elements and XML Structure
XML Schema for the OutlineCodes Element