title | ms.date | monikerRange | ms.localizationpriority |
---|---|---|---|
Table Element |
03/14/2018 |
>= project-client-2010 || project-client-odc |
medium |
A specific table for the project within the Tables element. A table is used by a view to determine which fields to display.
<Table>
ComplexTypeValue
</Table>
Element |
Required/Optional |
Description |
---|---|---|
Required |
The name of the table. |
|
Optional |
A boolean indicating if the table has been cusotmized from the version in the global. |
Minimum: 1 Maximum: 1000 |