Skip to content

Latest commit

 

History

History
32 lines (26 loc) · 970 Bytes

task_edit_scheduled_reports.adoc

File metadata and controls

32 lines (26 loc) · 970 Bytes
permalink sidebar keywords summary
reporting/task_edit_scheduled_reports.html
sidebar
editing, schedule, reports
After reports are scheduled, you can edit them on the Report Schedules page.

Editing scheduled reports

After reports are scheduled, you can edit them on the Report Schedules page.

What you’ll need

  • You must have the Application Administrator or Storage Administrator role.

Steps
  1. In the left navigation pane, click Storage Management > Report Schedules.

    scheduled reports 2
    Note

    If you have the appropriate permissions you can alter any report and its schedule in the system.

  2. Click the more icon more icon for the schedule you want to change.

  3. Click Edit.

  4. You can change the Schedule Name, Recipient list, Frequency, and Format for the report schedule.

  5. When done, click the check mark to save your changes.