Skip to content

Latest commit

 

History

History
22 lines (17 loc) · 1023 Bytes

task_committing_7_mode_aggregates_to_clustered_ontap_format.adoc

File metadata and controls

22 lines (17 loc) · 1023 Bytes
permalink sidebar keywords summary
copy-free/task_committing_7_mode_aggregates_to_clustered_ontap_format.html
sidebar
ontap, transition, copy, free, commit, project
The final step in transition is to commit the copy-free transition project. After committing the aggregates, you cannot perform a rollback to 7-Mode.

Committing the copy-free transition project

The final step in transition is to commit the copy-free transition project. After committing the aggregates, you cannot perform a rollback to 7-Mode.

You must have manually verified the transitioned data and configurations and tested workloads and applications.

All the aggregate-level Snapshot copies that were created in the export phase are deleted.

Steps
  1. Click Commit.

  2. In the warning message that is displayed, click Yes.

All the preproduction testing phase restrictions are removed and the transitioned volumes can serve production data, if not done in the preproduction testing phase.