Describe the bug
After creating/modifying a Calculation Group in a DirectLake model, a 'framing' operation is needed. TE3 should give a warning that the Calc Group table is unprocessed and needs to be processed in order to work.
To Reproduce
Steps to reproduce the behavior:
Application specifics
The text was updated successfully, but these errors were encountered: