function [CostAll,Pressure_Nodes,Length_Pipes] = Network_Cost_50(Dim)
for ii=1:50
Dim1=[180,180,180,180,180,180,132,132,180,204,204,204,204,204,204,72,72,60,60,60,72];
ss=(ii-1)*21+1;
Dim_temp=[Dim1';Dim(ss:ss+20,1)];
[Pressure_Nodes,Length_Pipes]=GetComputedHydraulic(Dim_temp);
Sum_Pipe_Cost=0;
Sum_Violation=0;
for i=1:(size(Length_Pipes,2)/2) % computing the cost of all pipes
Pipe_Cost=(1.1 * Dim_temp(21+i) ^ 1.24)* Length_Pipes(21+i);
Sum_Pipe_Cost = Sum_Pipe_Cost + Pipe_Cost;
end
%-------------------------------------------------------------------
for i=1: size(Pressure_Nodes,2) % computing the penalty cost
if Pressure_Nodes(i) <0
Sum_Violation= Sum_Violation + abs(Pressure_Nodes(i));
end
end
if Sum_Violation ~=0
%if Sum_Violation<=1
% Penalty_Pressure=10*10^6*Sum_Violation+2*10^6;
%else
Penalty_Pressure=12*10^6*Sum_Violation;
%end
Cost(ii) = Sum_Pipe_Cost + Penalty_Pressure ; % penalty factor=12,000,000
else
Cost(ii) = Sum_Pipe_Cost ;
end
end % end for
CostAll=sum(Cost);
end
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%