The Hitchhiker's Guide to the GitHub Project

The answer is not just 42, but also 3568!

We've got lots of dev activities going on in KITT4SME from design to coding to writing tech docs, there's plenty to keep us busy. The bulk of that comes from tasks in WP 2, 3 and 4, but WP 5, 6 and 8 also contribute bits and pieces to the dev stream. So below is a short intro to how we keep tabs on dev activities and get stuff done. The GitHub project that helps us with that is at:

Iterative approach

A year into the project, we're all familiar with project objectives and high-level features to be implemented to achieve them. But as we go along we still break down and refine those high-level features into more detailed and manageable chunks of work. We then implement those low-level features in two-week iterations—a.k.a. "sprints".

A sprint starts with a "grooming" session on a Monday. (Dunno why this song springs to mind.) We get together in this session to decide what features to work on in the next two weeks and flesh out high-level features. We pick features from the project backlog according to priority—high-priority stuff gets done first, low-priority items can be pushed back or moved to the next iteration. Each of us walks out of the session with a handful of low-level tasks to implement—and possibly a headache.

Each team implements and tests the low-level features assigned to them. Sometimes even small features may need more thinking time, so the team has to "shape" them before they can start coding. When done with the implementation and testing, a victim gets selected to review the code—or the docs if the task was about writing a technical piece.

The sprint ends two weeks later, on a Friday, with a show & tell and a little retro. Everyone demos the good stuff they've worked on. Then we talk about what worked well and what didn't and if our dev machine cogs need some lube to do stuff better in the next iteration.

Work breakdown structure

We've adopted a simple hierarchical structure to organise our work into manageable chunks and keep our sanity. At the top sit the project objectives we've got to achieve in the coming months. Each objective groups the high-level features to be implemented to achieve it. In turn, each high-level feature tracks all the smaller features needed to deliver it. These low-level features are meant to be something a person or two can comfortably work on during an iteration. Their content usually gets fleshed out in grooming sessions and includes three small sections:

  • Summary. A couple of sentences to explain what the feature is about. The summary focuses on functionality, keeping the technical details out.
  • Intended outcome. What's the end goal? What are the benefits?
  • How will it work?. A sketch of the high-level flow, keeping out as many technical details as possible.

The visual below shows what all this looks like on GitHub. We set up a KITT4SME project with an Objectives view you can use to drill down from high to low-level features. We use GitHub issues to document features. High-level features have a title starting with [Tracking] like the one you see below. Low-level features are just plain old GitHub issues like the one on the right-hand side of the visual which is tracked by the one shown in the middle. Notice we link each issue to the accounts of the devs working on it—"Assignees" field.

Work breakdown structure on GitHub.

We also threw in a Roadmap view for good measure. The roadmap basically contains the same info as the objectives view but the features are grouped by milestone. Same same but different. No, honestly, the idea is that this alternative arrangement of high-level features should make it easy to get a sense of our dev plan.

Tying features to the architecture

We attach GitHub labels to each issue to be able to tell how it relates to the architecture—especially to the cloud instance layers. In fact, we use these labels:

  • AI / app services. Platform application services.
  • infra. Platform infrastructure services.
  • mesh. Mesh infrastructure.
  • security. Platform security.
  • hardware. Hardware to run the platform.
  • RAMP. Integration with the RAMP platform.
  • docs. Improvements or additions to documentation.
  • bug. Something isn't working.
  • tracking. Issue group to track progress of smaller chunks of work.

We attach the same labels to pull requests too so it's easy to find all the items related to a particular architectural function. (Pull requests are explained in the next section.) For example, here's a screenshot of a GitHub search for all the items related to platform infrastructure services.

Finding all infra issues and PRs.

Tying features to the implementation

We use GitHub pull requests to track what it took to implement a feature, who did the work and who reviewed it. A pull request (PR) is a proposal for merging a change set into a repo. Typically a PR's change set implements a single (low-level) feature, but occasionally it can implement more than one. Each PR comes with a detailed technical description of the code (or docs) changes and links back to the feature it implements. GitHub automatically generates a diff for the change set so you can see exactly what code got added, modified or deleted.

The visual below shows a typical KITT4SME PR on GitHub. As you can see, the PR links back to the feature it implements and contains a generous amount of technical explanations. Also notice we link each PR to the accounts of the devs who worked on it as well as the reviewers—"Assignees" and "Reviewers" field, respectively.

GitHub pull request.

Running a sprint

Well, it's more of a marathon than a sprint but we definitely never stand still! While running a sprint (iteration), we use a Kanban board to help us stay on track—pun intended :-) The board has five columns:

  • Backlog. Features (or fixes) planned for the sprint but that nobody's working on at the moment.
  • Shaping. Features that need more thinking time before coding. As it happens, sometimes even if we thought a feature was clearly defined in the grooming session, when you get to write the code you realise some important details are missing or were overlooked during the grooming session.
  • In-progress. Features currently being implemented—that includes dev testing too.
  • QA. Items devs have finished working on and are now ready for review.
  • Released. Stuff we got out of the door and is now live.

This is what Spint 2's Kanban board looked like towards the end of the iteration.

Sprint 2 at 03 Feb 2022.

One last thing we should mention is the Sprints view. Out of convenience, we added this extra view to the KITT4SME project so we can tell at a glance who was tasked with what when as well as the status, progress and priority of the various work items. Within this view, low-level features are grouped by the iteration they have been worked on or for which they're planned.