aweek 1.0.3

CRAN MAINTENANCE

  • as.POSIXlt() method for aweek objects no longer converts dates to character before converting to POSIXlt

aweek 1.0.2

CRAN MAINTENANCE

  • A test that was failing due to an incorrect assumption that the first day of the year would always fall on the first week of the year was fixed (see reconhub/aweek#35 for details). (#36, @zkamvar).

MISC

  • Continuous integration has been migrated from Travis-CI + AppVeyor to GitHub actions.

aweek 1.0.1

CRAN MAINTENANCE

  • as.POSIXlt() now converts NULL to an empty POSIXlt object, so a test that was previously checking for an error failed. That test has been fixed (#33, @zkamvar)

aweek 1.0.0

NEW FUNCTIONS

  • change_week_start() allows the user to change the week_start attribute of an aweek object, adjusting the weeks to match the new attribute accordingly.
  • get_aweek() can generate aweek objects from a vector of week numbers. It has the ability to take into account different week start times.
  • get_date() is similar to get_aweek(), but returns dates instead.
  • as.aweek() allows users to create aweek object directly from characters with validation. It also allows for dates by passing to date2week().
  • as.data.frame.aweek() is a new function that allows aweek objects to be directly incorporated into data frames.
  • as.list.aweek() will now preserve the aweek structure in lists
  • trunc.aweek() will truncate the day to the first day of the week.
  • rep.aweek() allows repeating aweek characters.
  • factor_aweek() allows the user to create aggregated aweek objects on the fly.

BREAKING CHANGES

There are a couple of breaking changes coming to aweek that will improve stability by removing unclear coercion methods (see reconhub/aweek#20).

  • It is no longer possible to combine aweek objects if they do not share the same week_start attribute. This will result in an error informing the user to adjust the week_start attribute with the change_week_start() function.
  • Factors will no longer coerce factors when combining aweek objects.
  • Using date2week() with factor = TRUE and floor_day = FALSE now throws an error instead of a warning (as prophesized in #13).

DOCUMENTATION

  • The vignette has been updated to include an explanation of the underlying week calculation from date.
  • The aweek class documentation has been updated to detail the different elements of the object and the calculations.
  • Package documentation package?aweek has been added for an introduction.

BUG FIX

  • conversions will now retain the names of the object.

MISC

  • More checks that weekdays and weeks are within the correct bounds have been added.
  • as.Date.aweek has been simplified to no longer rely on regex since the aweek class is standard.
  • The internal get_wday() has been vastly simplified with improved speed.

aweek 0.3.0

  • The week_start argument now defaults to the global option aweek.week_start, which will be a number from 1 to 7, representing the days of the week in the ISO 8601 standard.
  • set_week_start() is a convenience allowing the user to set the default aweek.week_start option via integer or character input.
  • get_week_start() is a wrapper for getOption("aweek.week_start", 1L) and attr(w, "week_start") for aweek objects.

aweek 0.2.2

  • Simplified conversion to factors.
  • Using factor = TRUE without floor_day = TRUE will now issue a message indicating that this is deprecated in future versions of aweek (see #13).

aweek 0.2.1

  • Fix bug where NAs threw errors in the dates (found: @aspina7, #12)

  • as.data.frame.aweek() will now convert aweek objects to columns of data frames without losing class or attributes

  • The introduction vignette has been updated to reflect this change.

aweek 0.2.0

  • Subsetting and concatenating methods added to the aweek class (see #1)
  • Documentation divided into smaller chunks
  • as.POSIXlt() bug where tz was not being passed was fixed.
  • date2week(): an error is now issued if users specify non-ISO 8601 dates OR don't specify a format option. (found: @scottyaz, #2)
  • Best practices added to vignette
  • Fix test that would fail every seven days on CRAN

aweek 0.1.0

  • First official release of aweek on CRAN

aweek 0.0.5.9000

  • date2week() and week2date() can now take days represented as characters in the current or English locale.

aweek 0.0.4.9000

  • date2week() gains a factor argument, which will automatically compute the levels within the date range.

aweek 0.0.3.9000

  • date2week() now properly accounts for dates in December that occur in the first week of the next year.

aweek 0.0.2.9000

  • floor_day now truncates the week instead changing the last digit to 1 for aesthetics. (Thanks to @aspina7 for the suggestion) q print.aweek() now displays the day of the week in the current locale.

aweek 0.0.1.9000

  • First version of package
  • date2week() converts dates to aweek objects
  • week2date() converts aweek objects or character strings to dates
  • as.Date() does the same thing as above
  • as.POSIXlt() as well
  • as.character() will unclass the aweek object
  • Added a NEWS.md file to track changes to the package.