Replies: 3 comments 4 replies
-
I intend to do cluster deployment, but three services are deployed now, and all three services are running. I would like to know whether the error in the cluster status report indicates that the cluster is not built successfully. |
Beta Was this translation helpful? Give feedback.
-
From the error message, I guess that the connection is refused. |
Beta Was this translation helpful? Give feedback.
-
sorry, I used the endpoints param wrongly. You should like this: |
Beta Was this translation helpful? Give feedback.
-
{"level":"warn","ts":"2023-01-31T18:51:15.491+0800","logger":"etcd-client","caller":"v3/retry_interceptor.go:62","msg":"retrying of unary invoker failed","target":"etcd-endpoints://0xc00034aa80/127.0.0.1:2379","attempt":0,"error":"rpc error: code = DeadlineExceeded desc = latest balancer error: last connection error: connection error: desc = \"transport: Error while dialing dial tcp 127.0.0.1:2379: connect: connection refused\""} Error: context deadline exceeded
This error was reported to me when I used this command, I don't know how to solve it, please help me
Beta Was this translation helpful? Give feedback.
All reactions