You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Apr 8, 2020. It is now read-only.
I am wondering why it is not possible to set a custom retry strategy in case of job failure:
More precisely, the developer can only define the way backoff must be increased (either exponentially or linearly) but it is not possible to change initial backoff value nor maximum backoff value (they are set to 30 sec and 3600 sec respectively and they cannot be changed).
Thanks!
The text was updated successfully, but these errors were encountered:
Hello,
I am wondering why it is not possible to set a custom retry strategy in case of job failure:
More precisely, the developer can only define the way backoff must be increased (either exponentially or linearly) but it is not possible to change initial backoff value nor maximum backoff value (they are set to 30 sec and 3600 sec respectively and they cannot be changed).
Thanks!
The text was updated successfully, but these errors were encountered: