You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
When changing the due day of a task, the due time is automatically reset (typically to 12 pm) instead of remaining as previously set. It would be more natural if the due day could be changed without affecting the due time. A user case would be someone trying to reschedule a task due today in the evening (say 7 pm) to another day at the same time in the evening (7 pm). I am using the latest Vijunja version (0.18.2) on Cloudron.
The text was updated successfully, but these errors were encountered:
svigneau
changed the title
Changing the day of a task without changing its time
Due time is reset when due day is changed
Jan 2, 2022
When changing the due day of a task, the due time is automatically reset (typically to 12 pm) instead of remaining as previously set. It would be more natural if the due day could be changed without affecting the due time. A user case would be someone trying to reschedule a task due today in the evening (say 7 pm) to another day at the same time in the evening (7 pm). I am using the latest Vijunja version (0.18.2) on Cloudron.
The text was updated successfully, but these errors were encountered: