single: CLIMRISK single: CLIMRISK-RIVER single: GLOFRIS single: IVM - VU single: flood adaptation single: flood proofing single: river flooding
Direct impacts of river flooding using the CLIMRISK-RIVER model. This includes direct impacts to built environment and infrastructure.
The damage is expressed as a change in expected annual damage (EAD) w.r.t. 2010.
Files include two adaptation assumptions: no additional adaptation and optimal adaptation (using CBA estimates).
Units: millions EUR (2015) PPP.
- Sector: Direct impacts to built environment and infrastructure
- Partner: IVM - VU
- SSP: SSP1, SSP2, SSP3, SSP4, SSP5
- RCP: RCP2.6, RCP4.5, RCP6.0, RCP8.5
- Spatial resolution Europe: NUTS2 2013
- Keywords: river flooding, river flood adaptation, glofris, flopros
Ignjacevic, Predrag