You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
"
The first element
of the node data list (node data list [0]) contains the last node
of the path while the last node data of the node data list (node
data list[n]) contains the first node data of the path traced.
"
Is this for Incremental Trace option or for both Incremantal Trace option and Pre-allocated option?
The text was updated successfully, but these errors were encountered:
https://mailarchive.ietf.org/arch/msg/ippm/v4a75IXTi8GKfDl_Ddm_5WN6gxs
"
The first element
of the node data list (node data list [0]) contains the last node
of the path while the last node data of the node data list (node
data list[n]) contains the first node data of the path traced.
"
Is this for Incremental Trace option or for both Incremantal Trace option and Pre-allocated option?
The text was updated successfully, but these errors were encountered: